50
2
Hardware Installation
Front Panel Connectors
HDD-LED - HDD LED
This LED will light when the hard drive is being accessed.
RESET SW - Reset Switch
This switch allows you to reboot without having to power off the system.
PWR-BTN - Power Switch
This switch is used to power on or off the system.
PWR-LED - Power/Standby LED
When the system’s power is on, this LED will light. When the system is in the S1
(POS - Power On Suspend) state, it will blink every second. When the system is
in the S3 (STR - Suspend To RAM) state, it will blink every 4 seconds.
HDD-LED
RESET-SW
PWR-LED
PWR-BTN
12
11
2
1
Pin
Pin Assignment
Pin
Pin Assignment
HDD-LED
3
HDD Power
PWR-LED
2
LED Power
5
Signal
4
LED Power
RESET SW
7
Ground
6
Signal
9
RST Signal
PWR-BTN
8
Ground
11
N.C.
10
Signal
Содержание GMB-C2160-LLVA
Страница 1: ...GMB C2160 LLVA System Board User s Manual J24800245...
Страница 88: ...88 4 Supported Software Auto Run Pages for Windows 7...
Страница 90: ...90 4 Supported Software 3 Click Exit...
Страница 100: ...100 4 Supported Software 4 Click Install to begin the installation 5 After completing installa tion click Finish...
Страница 112: ...112 4 Supported Software 7 Click Install 8 The setup program is cur rently installing the driver 9 Click Finish...