Conlog BEC21 Скачать руководство пользователя страница 4

 

   Safety and Maintenance Instructions 

 

 

Do not use product if physical or liquid damage is present.  Contact your local supply 
authority for assistance.

 

 

The wiring must be performed by a certified installation electrician and must conform to 

the prevailing government standards and safety regulations.

 

 

This product is not a protection device and so requires the use of a suitable upstream 

breaker e.g. 60A rated circuit upstream breaker.

 

 

When wiring the meter, ensure that the incoming supply is isolated by switching off the 
upstream breaker.

 

 

We recommend that if you are connecting aluminium cables to this product, you use 
bi-metal lugs.  

 

Ensure that equipment is only accessible to an authorized and trained service person.

 

 

Ensure that the appropriate tools are used for the installation. 

 

Ensure that the meter is installed in a dry location and is not exposed to water or 
moisture 

 

No sharp objects to be used to press the keypad. If keypad is damaged, please call 
service technician. 

 

There are no serviceable parts on the meter. Faulty meters must be returned to the 

manufacturer for repairs. Only when these parts are fitted by the manufacturer can the 
safety of the appliance can be guaranteed. 

 

Cleaning of the meter must be done by a dry cloth. 

 

Do not use liquids to wipe the meter as this may result in electrical shock. 

 

Do not make any alterations to the appliance, Warranty will be void and safety of the 
meter will be compromised.  

 

Never open the casing/housing of the appliance. Tempering with electrical connections 

or components and mechanical parts is highly dangerous and can cause operational 
faults or electric shock. 

 

Ensure product is disposed of, in accordance with local and national regulations. 

                                                      

 

Содержание BEC21

Страница 1: ......

Страница 2: ...afety Information 3 Safety and Maintenance Instructions 4 Installation 5 Diagrams and Illustrations 5 Procedure 6 Testing the Meter Installation and Sealing the Device 7 Cabling Specifications 7 Displ...

Страница 3: ...ical Contractor No responsibility is assumed by Conlog Pty Ltd for any consequences arising out of the use of this material An installation electrician or electrical contractor is one who has skills a...

Страница 4: ...ls are used for the installation Ensure that the meter is installed in a dry location and is not exposed to water or moisture No sharp objects to be used to press the keypad If keypad is damaged pleas...

Страница 5: ...iagrams and Illustrations Figure 2 Terminal Cover Remove terminal screw before mounting the meter and insert the terminal screw on to the terminal cover Figure 1 Product Layout Figure 3 Terminals Figu...

Страница 6: ...ve supply to L LINE Figure 3 7 Connect the incoming neutral supply to N LINE Figure 3 8 Connect the outgoing live supply to L LOAD Figure 3 9 Connect the outgoing neutral supply to N LOAD Figure 3 10...

Страница 7: ...to the serial number printed on the meter label and card to confirm that the numbers match 6 Turn on an appliance or light in the consumer s premises to ensure that the consumer has electricity In so...

Страница 8: ...alised contact Conlog E02 Meter not calibrated contact Conlog E03 Internal error contact Conlog E04 No supply voltage present E05 Reserved for future use E06 Reserved for future use E07 Communication...

Страница 9: ...it Status LED Rate LED 1000 imp kWh Terminals Layout Live Neutral Neutral Load Type Cage clamp Maximum size 16mm Interrogation Type Near Field Communication NFC Compliance Standards IEC 62052 11 IEC 6...

Отзывы: