![Congo Play MONKEY PLAYSYSTEM TOWER Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/congo-play/monkey-playsystem-tower/monkey-playsystem-tower_assembly-instructions-manual_2652500022.webp)
*PHASE 52
TURBO SUPPORT RING ATTACHMENT
STEP 1: Gather parts and hardware shown in table 52.
STEP 2: Center turbo slide opening in wall opening, secure
the top with Clamp and attach the bottom with
05/16"
x
3" lag bolt and 05/16" flat washer.
(See detail - 66).
*
The slide opening piece will
appear different for the upgraded turbo.
DETAIL - 66
TABLE 52 - PARTS AND HARDWARE
ID LETTER DESCRIPTION
TURBO SUPPORT RING
05/16" x 3" LAG SCREWS
05/16" FLAT WASHERS
05/16" x 3 1/2" HEX BOLTS
05/16" TEE NUTS
DETAIL - 67
STEP 3: Using a drill with 03/8" drill bit, drill a
through hole into "00" turbo wall slat
and "M" tarp support. (See detail - 67)
STEP
4:
Hammer 05/16" tee nut into "M" tarp support .
QTY
2
4
2
2
•
05/16" TEE NUT
Attach turbo slide ring with 05/16"
x
3 1/2" hex bolt,
05/16" flat washer.