background image

1. 

Validity of General Terms and Conditions

1.1   Until Conergy Pty Ltd ABN 57 112 387 569 (“Conergy”) notifies a 

customer of replacement Terms and Conditions, these Terms and 

Conditions will apply to all sales of products (“Products”) and supplies 

of services (“Services”) by Conergy and will form part of any contract 

resulting from any customer (“Purchaser”) placing an order with 

Conergy except as varied by written agreement by Conergy and the 

Purchaser (“Order”). 

1.2   In the event of any inconsistencies between any Order or other 

documentation of the Purchaser and these Terms and Conditions, 

these Terms and Conditions will prevail. 

Offer and Conclusion of a Contract

2.1   A quotation is not an offer by Conergy to sell or supply and may be 

withdrawn or varied at any time prior to Conergy’s acceptance of an 

Order, and is void after thirty (30) days unless extended in writing by 

Conergy.  In addition, prices are subject to variation in accordance 

with clause 3.  Conergy reserves the right to correct typographical 

and clerical errors.  Any and all declarations of acceptance and Orders 

need to be confirmed by Conergy in writing or by fax to become 

legally effective.  Conergy’s issue of an Order acknowledgement is 

not and does not imply acceptance of any terms or conditions in any 

Order form or other documentation of the Purchaser. 

2.2   Conergy’s employees are not authorised to make any oral collateral 

agreements or oral confirmations which go beyond the content of 

the written contract and the Purchaser will not rely on any such oral 

collateral agreements or oral confirmations. 

2.3   In the event that Conergy cannot perform an accepted Order for 

whatever reason, Conergy will immediately inform the Purchaser 

that the performance is not available and the Purchaser’s counter-

performance relating to the specific accepted Order will be 

immediately reimbursed. 

2.4   Only properties which are set out in the technical product description 

of an Order are considered to be agreed as quality of the Products.  

Public statements, recommendations or advertising of the 

manufacturer are not considered contractual qualities of the Products.

2.5   Any and all drawings, illustrations, measures, weights or other 

performance data related to a quotation or an offer to a Purchaser will 

only be binding if they are explicitly agreed in writing by Conergy. 

2.6   Quotations may only be accepted as a whole; component parts of 

a quotation are not open to be accepted separately.  Subsequent 

Orders are subject to further quotation.

3. 

Prices and Terms of Payment

3.1   The terms of payment are net cash before dispatch, unless the 

Purchaser has a current credit account with Conergy.  The terms 

of payment for a Purchaser with a current credit account are net 

cash, free of exchange, thirty (30) days from the end of the month 

in which the Products are delivered, or are ready for delivery, or the 

Services are supplied.  Conergy reserves the right to invoice for 

partial deliveries or supplies, or deliveries or supplies delayed at the 

Purchaser’s request. 

3.2  Prices quoted or accepted:
 

3.2.1   do not include taxes, imposts or duties.  Conergy may recover 

from the Purchaser, and the Purchaser must pay the amount 

of any sales tax, customs tax, use tax, consumption tax, 

goods and services tax, value-added tax or any similar tax, 

impost or duty levied on any supplies made by Conergy to 

the Purchaser under or in connection with these Terms and 

Conditions; and 

 

3.2.2   are “ex works” and all costs of freight and delivery from 

Conergy’s works will be to the Purchaser’s account. 

3.3   Conergy reserves the right to modify its prices accordingly if there 

is any change in the costs of labour, materials, transport, essential 

services, tariffs, duties, exchange, and other costs and statutory 

obligations, between the date of quotation and the date of invoice.   

Conergy will provide proof of such cost changes at the Purchaser’s 

request. 

3.4   Conergy must agree to any reduction of cash discounts separately in 

writing. 

3.5   The Purchaser must pay interest on any amounts in arrears.  Interest 

will be calculated from the due date for payment until Conergy 

receives payment. 

3.6   Conergy may use payments to satisfy older debts, even if otherwise 

stated in the Purchaser’s terms and conditions. Conergy will inform 

the Purchaser about any such set-off.  In the event that the Purchaser 

has already incurred costs and interest , Conergy will be entitled to 

set-off the payment, first with costs, then with any applicable interest 

and finally with the principal performance. 

3.7   The Purchaser will not cancel or amend any Order accepted by 

Conergy without Conergy’s written approval.

4. 

Period of Delivery and Performance

4.1   Delivery will be deemed to occur when Conergy informs the 

Purchaser that the Products are ready for collection at Conergy’s 

works.

4.2   Dates and periods of delivery of which Conergy will advise the 

Purchaser in writing only, will be regarded as best estimates, 

but will not be guaranteed and may be subject to extension to 

cover delays caused by Government priorities, strikes, lockouts, 

breakdowns, delays in transport, fines, late delivery of raw materials or 

components, or other causes beyond Conergy’s control, and Conergy 

will accept no responsibility or liability for the consequence of any 

delays.  In this event, Conergy will be entitled to postpone the delivery 

and the performance by the period of the complication plus an 

appropriate restarting time, or to cancel the acceptance of  an Order 

in full or in part with respect to the part not yet fulfilled. 

4.3   If a complication referred to in clause 4.2 lasts more than three 

months, following the setting of an appropriate additional period of 

time, the Purchaser may cancel that part of the Order which has not 

already beenperformed by Conergy.  In the event that the period of 

delivery or performance is extended or in the event that Conergy is 

released from its obligations, the Purchaser will not be entitled to any 

claim for damages.  

4.4   If Conergy accepts in writing responsibility for non-compliance with 

bindingly agreed dates and periods of delivery or performance the 

Purchaser shall be entitled to compensation for delay amounting to 

a half percent for every full week of delay, totalling a maximum of 

five percent of the invoice value of the Products and Services Order 

affected by the delay.  Any and all further claims will be excluded, 

unless the delay is caused by Conergy’s gross negligence. 

4.5   Conergy may carry out partial deliveries and partial performances at 

any time within the period advised by it for delivery or performance.

4.6   Any delivery and performance obligations arising in relation to 

these Terms and Conditions will not apply to Conergy until timely 

satisfaction of all the Purchaser’s corresponding duties.  Time for 

payment will be of the essence of the contract.  

4.7   If the Purchaser requests Conergy to delay delivery or performance, 

or fails to give Conergy adequate instructions for delivery or 

performance, or is in delay of acceptance of delivery or performance 

for any other reason, Conergy may claim the damage or cost caused 

by such delay, including the cost of storage of Products.  Upon 

the beginning of the delay in acceptance, the risk of accidental 

deterioration or accidental loss of Products passes to thePurchaser. 

5. 

Passing of Risk

 

 All Products will be at the Purchaser’s risk from the point of delivery 

as defined in clause 4.  Insurance cover is the responsibility of the 

Purchaser, and Conergy will not be responsible for any loss or 

damage occurring after the point of delivery and will only arrange 

insurance upon written instructions from the Purchaser, and at the 

Purchaser’s cost.  

6. 

Liability for Defects or Shortfall

6.1   If there is any shortfall in the number of Products, or if the Products 

are damaged during delivery, the Purchaser will inform Conergy within 

three (3) days from the date of delivery.  If the Purchaser does not, 

then Conergy will not be responsible for any loss or damage suffered 

by the Purchaser as a result of the shortfall or damage. 

6.2   If there is a shortfall in the number of Products or if the Products are 

damaged during delivery, Conergy’s liability will in any case be limited 

to the price of the Products not delivered or damaged. 

6.3   No returns may be made, or will be accepted by Conergy, unless the 

returned Products are defective or damaged in transit.  In either case, 

the Purchaser must first give notice under clause 6.1 before it can 

return the Products. 

CONERGY PTY LTD - GENERAL TERMS 
AND CONDITIONS FOR TRADE

Содержание SunEasy 1000

Страница 1: ...SunEasy User Manual Grid Connect Solar Power System www conergy com au ...

Страница 2: ... 3 2 To Check Systems with the SMA Sunny Boy Inverter 10 3 2 1 Operating Mode Indication 10 3 2 2 Normal Operating Mode 10 3 2 3 Description of Operating Mode 10 4 System Maintenance 12 4 1 Maintenance Timetable 12 4 2 Trouble Shooting 12 5 System Drawings 13 6 Safe Operating Induction Certificate 14 7 Where to get help 15 8 Maintenance Checklists 16 Conergy Pty Ltd General Terms and Conditions fo...

Страница 3: ...f use and ease of installation These kits have been designed to meet the requirements of the current Australian electrical and building codes including wind loading requirements Now that your system has been commissioned it should operate automatically Should you wish to know more about your system please read this manual and make yourself familiar with all safety requirements Observing all safety...

Страница 4: ... the photons hit the silicon surface in the solar cells they generate electricity by transferring energy and freeing electrons In this way electricity is generated Put simply photovoltaic cells are energy converters converting the energy from sunlight into electricity Solar modules usually contain multiple number of solar cells encased in a durable casing Toughened glass is used to cover and prote...

Страница 5: ...ely 5 Daily Energy Yield kWh Kit Sydney Melbourne Brisbane Perth Adelaide SunEasy 1000 4 02 4 03 4 04 4 82 4 40 Sun Easy 1500 6 02 6 05 6 06 7 22 6 59 Sun Easy 2000 8 03 8 06 8 08 9 63 8 79 Kit Alice Springs Canberra Darwin Auckland Wellington SunEasy 1000 4 33 4 16 3 84 3 88 3 56 SunEasy 1500 6 50 6 24 5 75 5 81 5 33 SunEasy 2000 8 66 8 32 7 67 7 75 7 11 Item Item Description 7 Array DC cables 8 ...

Страница 6: ...orking in the vicinity of the installed solar module area when raining or when the area is still wet The installed solar power system generates electricity when exposed to the sun The generated voltage is dangerous and can be fatal The whole surface must be covered by black sheets prior to working on the system in order to ensure that no electricity is being generated Observe all safety signs inst...

Страница 7: ...e solar modules In daylight hours as well as at dusk and dawn DC voltage will be present in the connected wires and cables Safe work on roofs After shutting down your system in the order above if persons are working on your roof you must make them aware that there is the possibility of a small non lethal electrical charge being present in the base frame and module frames Cleaning the solar array D...

Страница 8: ...ls Operating instructions Please refer to the enclosed operating instructions for further safety information on your inverter and instructions for displaying your system performance data Warning notices Safety Signs and Instructions All safety instructions and warning signs installed with the system Must be kept in a legible condition Must not be damaged Must not be removed Must not be covered pas...

Страница 9: ...y We recommend that you check the meter and inverter once a fortnight as follows Meter Check it during the day when there are no or minimal electrical appliances operating in your house The meter should be showing energy exported 3 1 To Check Systems with the Conergy WR Inverter Inverter Check the LED light on the front of the inverter LED Status Indication Steady Green Solar System Operational No...

Страница 10: ...LED is blinking the Sunny Boy is in its normal operating status If all three LEDs are on the inverter is in its initialization phase which is a normal operating state as well All other signals indicate a disturbed operating state Refer to the inverter manual for more information on the different LED signal codes 3 2 3 Description of Operating Mode Standby at Night Initialisation If all LEDs are of...

Страница 11: ...s rectified Green LED is on Green LED blinks 3 times per second Insulation Failure Green LED blinks once per second Red LED is permanently on With this signal the Sunny Boy indicates a grid failure which can be caused by Grid under voltage Grid over voltage Grid under frequency Grid over frequency First find out whether there is a general power shutdown If you do not find any failure the grid conn...

Страница 12: ...t difference to your bill If you have not had your solar power system for the full quarter it may not have generated enough energy to make a significant difference to your bill If none of the above explains the difference and you are still concerned call your Conergy SunEasy system installer and ask for assistance to test the inverter and find out how much energy you have generated Then if require...

Страница 13: ...ARGE AREA MODULES 9 CONERGY LARGE AREA MODULES Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION INVERTER WR 1700 INVERTER WR 1700 Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION 12 CONERGY LARGE AREA MODULES ...

Страница 14: ...ch liability is incapable of being excluded or limited under any federal or state laws of Australia for any damages costs claims demands actions or other liability in respect of or arising from any injury death or from any loss of or damage to any property whether or not involving negligence or any other cause of action whatsoever caused or arising out of or incidental to or connected in any way w...

Страница 15: ...roof of purchase should you wish to claim against the manufacturer warranty Installer Name License No Contact Phone No Fax No Email Address Street Address Supplier Name Contact Phone No Fax No Email Address Street Address Conergy Contact Phone No 1300 551 303 Fax No 02 8507 2220 Email Address support conergy com au Street Address Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 ...

Страница 16: ...o faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual current devices Inverter st...

Страница 17: ...if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual curren...

Страница 18: ...ee of corrosion Data logger if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circ...

Страница 19: ...older debts even if otherwise stated in the Purchaser s terms and conditions Conergy will inform the Purchaser about any such set off In the event that the Purchaser has already incurred costs and interest Conergy will be entitled to set off the payment first with costs then with any applicable interest and finally with the principal performance 3 7 The Purchaser will not cancel or amend any Order...

Страница 20: ...usage or otherwise including any implied condition warranty term or representation as to the use of the Products their weight dimensions capacities colours or the correspondence of the Products with any contract description or as to merchantable quality fitness for any purpose or safety of the Products or operating performance where such performance is conditional on empirical factors or on the wh...

Страница 21: ...ers some form of insolvency administration all sums then owing by the Purchaser to Conergy in relation to the Products or in relation to other goods supplied or Services performed by Conergy will become immediately due and payable and Conergy may without prejudice to any of its other rights recover and resell the Products and any other goods supplied by Conergy and may for that purpose enter upon ...

Страница 22: ...ion or purchasing of new items e The prerequisite for the specified services being granted is that the module concerned has been used correctly This is only the case where it has been used in a stationary application on the mainland The guarantee does not cover maritime or mobile uses in particular f No warrantee services will be performed if the module is modified from its delivery condition as a...

Страница 23: ...Notes ...

Страница 24: ...For more information please contact us 1300 551 303 cost of local call Conergy Pty Ltd Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 Email sales conergy com au Fax 61 0 2 8507 2220 www conergy com au ...

Отзывы: