EXPANSION PORT MOUNTING
18
3. Expansion port mounting
3.1. Expansion port mounting for XR5i
Attention! Expansion port XPORT include when the router XR5i is switch off.
After unscrewed two screws (position 8) on box bottom part (position 3) and carried
out box top part (position 2) the expansion port XPORT (position 6) connect to connector J3
(see below) of the router B-UR-5i motherboard (position 1) from TOP side. Expansion port is
mounted to motherboard by the help of three distant columns (position 7). After expansion
port mounting the box is screwed by the help three screws (position 8).
Connector J3
Содержание xr5i sl
Страница 9: ...DESCRIPTION 9 Front panel XR5i Rear panel XR5i Front panel XR5i SL Rear panel XR5i SL...
Страница 15: ...DESCRIPTION 15 2 11 Mechanical external dimensions and mounting recommendations...
Страница 40: ...CONFIGURATION 40...
Страница 43: ...CONFIGURATION 43...
Страница 63: ...CONFIGURATION 63 4 31 2 VRRP Configuration 4 31 3 Firewall Configuration...
Страница 64: ...CONFIGURATION 64 4 31 4 NAT Configuration 4 31 5 OpenVPN Tunnel Configuration...
Страница 65: ...CONFIGURATION 65...
Страница 66: ...CONFIGURATION 66 4 31 6 IPsec Tunnel Configuration...
Страница 67: ...CONFIGURATION 67 4 31 7 GRE Tunnels Configuration 4 31 8 L2TP Tunnel Configuration...
Страница 68: ...CONFIGURATION 68 4 31 9 DynDNS Configuration 4 31 10 NTP Configuration 4 31 11 SNMP Configuration...
Страница 69: ...CONFIGURATION 69 4 31 12 Expansion Port Configuration 4 31 13 USB Port Configuration...
Страница 70: ...CONFIGURATION 70 4 31 14 Startup script...
Страница 71: ...CONFIGURATION 71 4 31 15 Up Down script 4 31 16 Automatic update...