background image

The perspective when installing the rod and 
screen will be from behind the valance, noT 
straight on.

Step 8:

Step 9:

Lay out screen panels on a flat surface. Using 
straight end of the rod and starting at end of 
panel opposite cool grip pull, begin threading the 
rod through rings. Be sure to skip the first ring (it 
will be attached inside the valance later).

To install right side panel, be sure pull side of the 
screen is towards middle of the firebox.  Then 
insert straight end of rod through the center rod 
holder hook farthest away from the right side (It 
will be a straight line from the rod hook on the 
end of the right side valance extension). Slide rod 
through the hook until there is enough room to 
insert the “right angle” end of the rod onto rod 
hook at the end of the valance extension.

Step 10:

Step 11:

Insert the “right angle” end of the rod onto rod 
hook by sliding it over and then down. 

Once rod is secure, attach the unthreaded first 
ring onto the rod hook on right side valance 
extension (This helps prevent the screen from 
pulling away from the walls of your firebox when 
in use).  Repeat steps 8-11 for left side.

Step 6:

Step 7:

Drill a pilot hole on the pencil mark using the 
same 3/16 inch masonry drill bit.

Slide valance extension back to meet the outer 
wall. Then secure to inner wall of your firebox 
with a tapcon screw. Repeat steps 5-7 for 
opposite side valance extension.

It is preferable to use a masonry drill bit for 
this project, but a regular drill bit will work if 
masonry is soft. Use anchors with your tapcon 
screws if needed.

Отзывы: