concept 2 PITCH CHECK Скачать руководство пользователя страница 3

 CONCEPT2.COM

Page 3   

0815

USING THE CONCEPT2 PITCH CHECK

      

PAGE 3 OF 3 

Fully tighten the top two bolts before you install the four side  bolts. Before final tightening of the four side bolts, sight down  the length of the frame to check for straightness at the joint.  Align the two frame pieces, then tighten.

Отзывы: