3.6
Door set-up, Learning and Functional tests
Once the physical installation phase described in the previous paragraph is completed, it is possible to
proceed with the power ON of the device and its configuration. In case of problems during the execution of
the phases, please refer to the paragraph 6.2. Refer to paragraph 4.3.2 for the front panel use.
STEP
Operation
Description
Notes
1
Power supply test
Connect the main power supply.
Press
key and checks the front panel display as
indicated.
Then press
key.
“88” followed by
“- -“
2
AUTOSET execution
Put the door panels near to the panels closed position
(gap<10cm), then press and
keep pressed
key
on
the door drive front panel.
Press
key, checking that “SL” is shown on the door
drive display,
then release key
.
Floor with DTBC contact active (not available for
magnetic switches application)
: AUTOSET for second TB
floor will start automatically.
The door starts the auto-set procedure auto-detecting:
-
the closing rotation
-
the skate space
-
the door movement space
-
the door closing torque profile to optimize the
closing force detection
-
the opening profile.
In case the of errors or alarms, proceed with the checks
suggested in the user manual.
To optimize the execution of the learning procedure, it
is suggested but not necessary to couple car and landing
door, executing the operations from the car roof in
inspection mode.
The learning phase is completed.
NORMAL, INSP. and
CONFIG LEDS are all
ON
“SL” fixed
Auto-set for DTBC
contact: “S2” fixed
In case or error:
“Er” alternate to the
error code
In case of alarm “AL”
alternate to the
alarm code
“OP” fixed