background image

Statox 560 Getting started 

Page 6 of 10 

 

Issue 12/2016 

 

5

 

Getting started and menu navigation 

Remove the yellow protective cap and unscrew counterclockwise the stainless steel protection cylinder.  
If there is a short circuit bridge at the sensor module (applicable for 2 electrode sensors) remove it. 
Insert the guiding pins into the relevant drill holes to connect the sensor module by pushing it carefully 
upward (see picture 5). 

 

 

Picture 5: Connecting the sensor module 

 
Now fingertight fasten the protection cylinder. The sealing ring must be clean!  
The warm-up procedure (see picture 6) can take some minutes, especially with 3-electrode-sensors.  
After the warm-up, the Statox 560 will go into the measuring mode. 
 
The following settings must be done after the start-up: 

 

Set the real time clock 

 

Set the self-test parameters 

 

Set the alarm relays 

 

 

Change the sensor module only in the menu Change Sensor in order to avoid a data loss in 

the sensor memory. 

 
 
The following schematics show the warm-up and an overview of the main menu of the Statox 560 with a 
short description.  
 
Hint: 
When the symbol 

 appears on right upper side of the display, internal diagnostics are made. During this 

time, the buttons are not active and there is no display update! 

Sealing ring 

Содержание Statox 560

Страница 1: ...s parts may be used The Statox 560 must not be connected to mains The supply voltage is 24 16 30 VDC All outputs of the Statox 560 may only be operated with 30 VDC Damaged or modified sensor heads mus...

Страница 2: ...e Statox 560 sensor head in upright position to the wall Use two M8 screws and suitable washers Compur Monitors offers an Ex e rated terminal box art 562988 made of varnished cast aluminum Picture 1 S...

Страница 3: ...o higher voltages or short circuiting the outputs may destroy it Picture 2 Statox 560 cable tail connection Caution A Connect the grounding contact to the ground of the building using a cable diameter...

Страница 4: ...e user and can be connected to a junction box if necessary The eXLink can be connected and disconnected in hazardous areas without hot work permit Picture 3 Connection of the eXLink Wire Function Desc...

Страница 5: ...ply 16 30 VDC 2 0 VDC Power supply ground 3 I_OUT 0 22 mA Current output 4 I_OUT Current output ground 5 Remote Self test Remote self test trigger 6 GND_R Common ground for relays 7 Maintenance Reques...

Страница 6: ...ing ring must be clean The warm up procedure see picture 6 can take some minutes especially with 3 electrode sensors After the warm up the Statox 560 will go into the measuring mode The following sett...

Страница 7: ...ce flashing yes yes Measuring mode Firmware 01 02 2016 06 16 10 33 Sensor detected NO SENSOR Loading Parameter COCL2 50 0 ppm Version 02 3 01 Sensor No 19718 b b w 3 2016 Warm up Please wait Please wa...

Страница 8: ...6 06 16 08 32 Service Output 2 mA Function Test Maintenance Request Short description Prooftest start Self test start set self test schedule Sensor calibration Sensor module replacement Error Code inf...

Страница 9: ...F flashing ON passive passive passive active Self test Monitoring 4 20 mA 7 Self test OFF OFF flashing ON passive passive passive passive Service Mode password protected 2 4 mA 1 Service menu OFF OFF...

Страница 10: ...Ohm EMC EN 61000 6 4 2007 A1 2011 EN 50270 2015 type 2 Functional safety SIL 2 compliant according to IEC 61508 2010 Automatic self test every 24 hours time is selectable Weight ca 4800 g Dimensions...

Отзывы: