Installation Instructions
1
. Select an area in your yard that is reasonably level and meets the space
requirements for your equipment. Ground Space: 9’ x 28’ Play Space: 13’ x
39’.
2.
Using the measurements from the top view diagram, measure and mark
the position of the Swing Hangers and Ladders on both 9’ Top Rails. Place
the Horizontal Ladder on to the ground in the desired location with Top
Rails in the correct position on the ground. (Measure and adjust the
Horizontal Ladder on the ground as necessary to provide for the proper
play space.)
3
. Move 9’ Top Rails and set aside.
4.
With the Horizontal Ladder in its proper position, mark the locations for
the holes where the two Upright Ladders will stand.
5.
Move the Horizontal Ladder and dig the holes (see #1A hole sizes for
cementing).
6.
Lay each Upright Ladder on the ground near the hole where it will
eventually stand. Make a mark 15” from the top of the 8’ Upright Ladder
onto each Ladder Rail. Make a mark 39” from the top of the 10’ Upright
Ladder onto each Ladder Rail.
7.
Move the Adjustable Sleeves to these marks and position them to
receive the Horizontal Ladder. On the 10’ Upright Ladder, this is
accomplished by turning them to point at a 90 degree angle towards what
will become the inside of the structure. (The rungs and the Third Leg Bolt
will be attached to what will become the outside of the structure.)
8.
On the 8’ Upright Ladder (the Slide will attach to this Ladder), repeat the
process similarly as on the other Ladder. However, the Adjustable Sleeves
should point toward, and the rungs are welded on what will become the
inside of the structure. This will make it easier to climb up the Ladder to the
Slide. Secure set screws.
9.
Place the Upright Ladders onto their sides with the bottom of the pipe
just over the hole where it will eventually stand. Attach the Horizontal
Ladder to the Adjustable Sleeves of the Upright Ladders and secure the set
screws (see #3 Horizontal Ladder to Upright Ladder assembly). Hint: Do