Safety Techniques 

 

The high voltage circuit of the HT-3000P-1A-AC can be shut off at any time by pressing 

the RESET button.  The HT-3000P-1A-AC has been provided with a Reset switch to provide an 
unarmed "Standby" setting when it is energized, but idle. When the red RESET button is lit. The 
tester  will  not  provide  high  voltage  until  the  RESET  button  and  the  TEST  button  have  been 
pressed in order. To prevent inadvertent operation, the operator should be instructed not to press 
the RESET button until the test is ready. 
 

The HT-3000P-1A-AC has been designed for one-touch operation with the right hand.  If 

possible, it should be set up to the left and in front of the equipment under test. The equipment 
under  test  should  be  connected  to  the  HT-3000P-1A-AC  and  then  left  alone  by  the  operator.  
After  the  operator  is  clear  of  the  Tester  and  the  equipment  under  test,  he  should  press  the 
RESET  Button,  then  the  TEST  Button,  with  his  right  hand.  This  will  allow  the  greatest 
separation between the operator and the test being conducted. 
 

The  HT-3000P-1A-AC  is  designed  to  bleed  the  high  voltage  away  after  the  test  has 

concluded.  In  order  to  ensure  that  any  voltage  present  in  the  equipment  being  tested  has  been 
completely  bled  away,  the  operator  should  not  unplug  the  equipment  under  test  from  the  HT-
3000P-1A-AC until the front panel meter reads zero volts.

 

 

Using the HT-3000P-1A-AC Dielectric Withstand Tester 

 
 

The dielectric withstand test involves high voltage and caution should be exercised when 

using  the  tester.    The  tester's  return  lead  is  connected  to  ground  potential  and  when  properly 
connected  to  the  equipment  being  tested,  it  will  guard  against  the  operator  contacting  high 
voltage.  Always make sure the return lead is firmly connected to exposed dead metal.   
 

Leakage Test 

 
 

The  HT-3000P-1A-AC  leakage  test  uses  a  separate  low-frequency  circuit  to  check  for 

excessive  leakage  between  primary  power  components  and  ground.  There  is  not  a  specific 
leakage current level pass/fail requirement at this time for most equipment, however, higher than 
normal leakage current on a particular  part may indicate an assembly or component problem in 
the primary circuit.   
 

The leakage current is also monitored by the HT-3000P-1A-AC to ensure that excessive 

leakage does not keep the tester from developing full voltage required for the high voltage test.  
The HT-3000P-1A-AC will provide full voltage at any leakage current level up to 1000 mA. The 
leakage current trip level is adjustable on the front panel.   
 

Excessive  leakage  current  is  not  grounds  for  failure  of  the  dielectric  withstand  test.  

Leakage current is  a normal result  of capacitance in the primary circuit between neutral or line 
conductors and ground. (In dielectric tests of some larger electric motors, leakage currents of as 
high as 95 mA are considered acceptable by safety agencies.)  However, leakage currents higher 
than normally anticipated for a particular model should not be ignored. This indicates problems 
of  low  resistance  up  to  a  short  circuit  between  line/neutral  and  ground,  and  failures  should  be 
investigated. Failure modes are discussed below. 
 

If  the  green  Full  Voltage  LED  lights  and  the  test  continues,  the  leakage  current  was 

below the amount set by the leakage adjust knob. 

 

 
 
 

Содержание HT-3000P-1A-AC

Страница 1: ...HT 3000P 1A AC Dielectric Withstand Tester 0 3000 Volts AC Output Instruction Manual...

Страница 2: ......

Страница 3: ......

Страница 4: ...micro controlled circuit design and ergonomic front panel and represents the latest in high voltage production line testing To fully appreciate all the features of your new meter we suggest that you t...

Страница 5: ...ii...

Страница 6: ...al Checkout Procedure 10 Performance Test 10 Setting up the HT 3000P 1A AC 10 Factory Settings 11 Display of Leakage Limit and Duration settings 11 Adjustment of the Leakage Current Level 11 Adjustmen...

Страница 7: ...1...

Страница 8: ...for conducting the dielectric withstand test should be as remote as possible from normal production line activities Only personnel actually conducting the test should be allowed in the area and it sho...

Страница 9: ...er s return lead is connected to ground potential and when properly connected to the equipment being tested it will guard against the operator contacting high voltage Always make sure the return lead...

Страница 10: ...being tested are still failing the primary circuit capacitance of the equipment may be too high to allow the AC dielectric withstand test to be used This is due to the AC voltage charging all capacit...

Страница 11: ...sing the RESET Button The test will not begin until the TEST Button is pushed If a failure is encountered the high voltage is immediately shut down a buzzer sounds and any voltage stored in the equipm...

Страница 12: ...s Tamperproof operation available ENVIRONMENTAL Operating Temperature 15 40 C Relative Humidity Range 0 90 non condensing GENERAL Input power requirements 240V 60 Hz 15A single phase Weight 180 lbs ap...

Страница 13: ...e during shipment We recommend that the instrument be surrounded by at least three inches of shock absorbing material on all sides of the container AC Line Voltage Requirements AC line voltage require...

Страница 14: ...8 Figure 2 Controls Indicators Connectors Model HT 3000P 1A AC Front Panel...

Страница 15: ...visual indication to the operator of the actual output voltage 9 Hipot Pass LED At the end of the test if no Excess leakage was detected the green hipot pass led will light and the test will terminate...

Страница 16: ...y verify the correct leakage current setting 7 Connect the RETURN lead to the HIGH VOLTAGE TEST lead make a short circuit Keep clear of the wire while the test is in progress 8 Push the red RESET butt...

Страница 17: ...to 1000 mA To set the leakage limit follow the steps below 1 Connect the HT 3000P 1A AC to a correctly rated source of supply and turn the power switch to the I or ON position Push the RESET button T...

Страница 18: ...ng with testing the HT 3000P 1A AC tester should be set up for production line testing See Section above before continuing CAUTION High voltage is generated by the HT 3000P 1A AC Although the chassis...

Страница 19: ...ce West USA is available Phone 800 748 6224 Hours 8 00 AM 4 00 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego C...

Страница 20: ...the calibration procedure is a DMM able to read true rms 0 3000 Vac 1 and a 3kohm 3600 w 1 resistor Service Information The HT 3000P 1A AC is warranted to the original purchaser for a period of 1 year...

Страница 21: ...Calibration adjustment calibrates the voltage output to agree with the meter reading 2 Leakage Current calibration adjustment calibrates the internal current meter to obtain the real current flowing b...

Страница 22: ...you can A Press Reset to exit out of the Calibration Mode and keep all of the currently programmed calibration settings or B Press Test to enter the Calibration Mode and create new calibration settin...

Страница 23: ...Return jack on the front panel of the HT 3000P 1A AC 4 In the calibration mode hit the Reset button until L1 is displayed on the front panel 5 Once L1 is displayed press the Test button once and 80 w...