Comnet FVT40D4SFP Скачать руководство пользователя страница 3

INS_FVT/FVR40D4SFP_REV–

03/31/10

PAGE 3

FIGURE 4 – RJ45 BREAK-OUT

5 pc. Factory Supplied

INSTALLATION AND OPERATION MANUAL 

FVT/FVR40D4SFP

TECH SUPPORT: 1.888.678.9427

Содержание FVT40D4SFP

Страница 1: ...Figure 5 on Page 4 illustrates the specific data connections for RS232 2 Wire RS485 and RS422 4 Wire RS485 This last data connection also applies to Manchester Bi Phase data transmission Each data channel is configured for the electrical interface by means of the DATA SELECT switch on the front panel Figure 6 on Page 4 illustrates the switch settings to set the type of data for each channel Figure...

Страница 2: ...BER DETERMINED BY SELECTION OF SFP MODULE BLACK BLACK WITH WHITE STRIPE FIGURE 2 FVT40D4SFP TRANSMITTER FIGURE 1 FVT FVR40D4SFP TRANSMITTER AND RECEIVER FIGURE 3 FVR40D4SFP RECEIVER INSTALLATION AND OPERATION MANUAL FVT FVR40D4SFP REAR PANEL REAR PANEL FRONT PANEL FRONT PANEL TECH SUPPORT 1 888 678 9427 ...

Страница 3: ...INS_FVT FVR40D4SFP_REV 03 31 10 PAGE 3 FIGURE 4 RJ45 BREAK OUT 5 pc Factory Supplied INSTALLATION AND OPERATION MANUAL FVT FVR40D4SFP TECH SUPPORT 1 888 678 9427 ...

Страница 4: ...on the front panel of the unit FIGURE 5 RJ45 SWITCH SETTINGS RS232 1 NC 2 Out 3 Ground 4 NC 5 NC 6 IN 7 NC 8 NC RS485 2W SENSORNET 1 NC 2 NC 3 IN 4 NC 5 NC 6 IN 7 NC 8 NC RS422 RS485 4W Manchester Bi Phase 1 OUT 2 OUT 3 IN 4 NC 5 NC 6 IN 7 NC 8 NC NC No Connection TECH SUPPORT 1 888 678 9427 INSTALLATION AND OPERATION MANUAL FVT FVR40D4SFP ...

Страница 5: ...OUT DIN DIN Data Out A Data Out B Data In A Data In B Data In A Data In B Data Out A Data Out B DIN DIN DOUT DOUT DOUT DOUT DIN DIN Data Out Data Out Data In Data In Data In Data In Data Out Data Out FIGURE 8 LED INDICATORS TECH SUPPORT 1 888 678 9427 INSTALLATION AND OPERATION MANUAL FVT FVR40D4SFP LINK VIDEO DATA POWER GREEN Communication link has An active video signal is An active data signal ...

Страница 6: ...s oriented right side up and slide it into the card guides in the rack until the edge connector at the back of the card seats in the corresponding slot in the rack s connector panel Seating may require thumb pressure on the top and bottom of the card s front panel CAUTION Take care not to press on any of the LEDs 2 Tighten the two thumb screws on the card until the front panel of the card is seate...

Отзывы: