CUSTOMER SERVICE:
United States
PO Box 2
Ulster Park, NY 12487
Office hours: 9-5 EST
Phone (800) 777-4244
Fax (800) 336-5948
(845) 572-3468
www.CommunityPlaythings.com
F601
Roomscapes
Guide
© 2011 by Community Products, LLC
PT29 DC 6739 Revision AE
Page 5
User Information
(cont’d)
To connect a shelf to another shelf:
1. Flip the toe trim down (so the wheels are out of
the way).
2. Roughly line up the shelves in the desired position
(straight, 45°, or 90°) leaving space for the Post.
3.Slide a Post down onto the couplings. Make sure
you catch the couplings of both units at the top
and bottom. (You may need to shift the units
slightly to get the Post on properly.) (Fig. J )
Check that all the couplings are secure in the Posts.
Pull up on the Posts to check that the childproof ring
has locked. (Fig. K)
CAUTION
c
Do not lift or tip the shelves. This may partially
engage the wheels.
To reconfigure your Roomscapes setup:
Disconnect items by turning the childproof lock ring
and pulling the Post up until it disengages from the
couplings.
Connection (cont’d)
To connect a panel to another panel or shelf:
1. Line up a groove in the Post onto the couplings on
the shelf (or panel which is already in position).
Slide the Post all the way down so that it locks
onto the couplings (listen for the click of the child-
proof ring locking). Inspect to make sure that both
the top and bottom couplings are engaged. (Fig.H)
2. Line up the couplings on the next panel into a
groove in the Post. Orient at whichever angle you
desire, but remember to follow the safety guide on
page 3.
3. Slide the panel down until it locks onto the Post.
Inspect to make sure that both the top and bottom
couplings are engaged. Pull up on Post to check
that the childproof ring has locked. (Fig. I )
Figure H
Figure I
Figure K
Figure J