CommScope SYSTIMAX 360 1100GS3 Скачать руководство пользователя страница 10

860584440 
Instruction Sheet 

 

www.commscope.com 

 

Page 10 of 11 

Patch Panel Termination Manager Instructions 

 

The  termination  managers  provide  pair  positioning,  control, 
and  strain  relief  features  to  the  rear  termination  area  of  the 
panel.  See  Figure  1.  Instructions  for  using  the  termination 
manager are listed below. 

Feed Pairs into Termination Manager (Figure 2) 

1.  Trim  jacket  back  at  least  3  inches  (76mm)  to  expose 

twisted pairs. 

2.  Without  crossing  over  or  rearranging  pairs  out  of 

the jacket, position pairs in-line per pair colors below: 

T568B Wiring Application (Shown) 

Blue, Brown, Orange, Green 

T568A Wiring Application 

Blue, Brown, Green, Orange 

3.  Insert  pairs  through  4  holes  on  top  surface  of  termination 

manager, one pair per hole, as shown. 

4.  Continue  to  feed  pairs  through  termination  manager  until 

resistance is encountered at the jacket. This will usually be 
about 1/4 inch (6mm) from the jacket. 

Fold Pairs into Slots (Figure 3) 

5.  Fold  each  pair  over  into  adjoining  slots  on  bottom  end  of 

termination  manager.  Conductor  colors  must  be  arranged 
in the slots as listed below: 

T568B Wiring Application (Shown) 

BL/OR Pairs 

– Blue/Orange conductors on top 

BR/GR Pairs 

– both White conductors on top 

T568A Wiring Application 

BL/GR Pairs 

– Blue/Green conductors on top 

BR/OR Pairs 

– both White conductors on top 

Important:    Add  twist  as  needed  to  align  pairs  with 
slots.  Never  remove  twist  for  any  pair.  Do  not  allow 
pairs  to  untwist  inside  termination  manager  or  inside 
cable jacket.

 

6.  Ensure that both conductors of each pair are in slots 

completely without being pinched over bottom end surface. 

 

 

 

 

Figure 1.  Termination Manager 

Lock tab
(2 places)

Entry
holes

Fold slots
(4 places)

Entry holes

  

 

Figure 2.  Feed Pairs into Termination Manager 

Top

surface

Orange pair

Brown pair

Blue pair

Green pair

 

 

 Figure 3.  Fold Pairs Back into Slots 

Orange on top

White on
top

Blue on top

Содержание SYSTIMAX 360 1100GS3

Страница 1: ...ve fiber bezels rear cable management bar and front cable trough are utilized The 1100GS Evolve panels are available iPatch ready For instructions on using panels in an iPatch application see 860516491 iPatch Upgrade Module Instructions for SYSTIMAX 360 Panels Panel kits are available unpopulated for use with separately ordered modules Ordering information for modular panels is listed below 360 GS...

Страница 2: ... parts or any other issues to CommScope Customer Claims at 1 866 539 2795 or email to claims commscope com Outside the United States contact your local account representative or PartnerPRO Network Partner Tools Required Phillips head screwdriver Cable jacket scoring tool D 914 punch tool with M110 blade Specifications Wire Termination Wire Size 22 24 AWG 0 64 0 51 mm Solid Copper 22 24 AWG 0 64 0 ...

Страница 3: ...on the wide variety of 360 InstaPATCH modules that are compatible with the fiber bezel Distribution modules for the 360 1100GS3 1100GS6 panel kits must be ordered separately and are listed below Material ID Description 760151167 360 1100GS3 Evolve distribution module 6 port kit 760151183 360 1100GS6 Evolve distribution module 6 port kit 760175877 360 1100G2 Evolve fiber bezel 4 pack cool grey 7601...

Страница 4: ...ution modules are ordered separately 1 From the rear side of the panel insert the front face of the module into the desired panel opening Press firmly until both the left and right side module snaps fully engage with the panel When installing modules in either of the two end positions it is necessary to engage the outermost snap first Step 3 Terminate Conductors on Rear of Panel T568 Wiring Diagra...

Страница 5: ...er Preparation of X10D 91B Series Cable 95B Series Cordage or Xpress 88 Cable for Termination Preparation of the SYSTIMAX GigaSPEED X10D 91B series cable 95B series cordage or Xpress 88 series cable is shown above For complete instructions on preparing these cables for termination see instruction sheet 860469402 Step 4 Assemble and Install Rear Cable Manager 1 Attach the four cable troughs onto ba...

Страница 6: ...he port designations on the white label cards provided Slide labels and label covers into the label holders from either end Each label holder will accommodate labels up to 265 inches 6 7mm high x 3 50 inches 89mm wide 2 Blank voice and data icons can be ordered separately in a wide variety of colors and placed into the pockets in the lower portion of the label holders Note Product code M61K XX bla...

Страница 7: ...rately 1 Position a bezel against opening from rear of panel Push bezel from the rear until it snaps into panel opening Repeat for all bezels Step 3a Install Evolve G2 Fiber Trunk Cable Management Bar on Rear of Panel 1 Attach fiber management bar to rear of panel immediately behind the fiber row Place hook at both ends of bar into slots in panel brackets as shown Step 4a Install Evolve G2 Fiber M...

Страница 8: ... into modules 2 Slip fiber routing clips over fiber management bar at equally spaced positions similar to as shown above 3 Spread open a slot position provided on fiber routing clip and secure fiber cable inside 4 Repeat until all cables are inserted in the clips and adjust position of clips as necessary to hold the trunk cables in an organized manner 5 Wrap a strip of hook and loop fastener aroun...

Страница 9: ...ving either the flat or angled panel side cover s grip cover on the top and bottom at the outside edge where shown by arrows and pull forward As cover tabs release position fingers close to tabs to apply further pulling force 2 For angled panel only remove both side covers from panel before removing center cover ...

Страница 10: ...d at the jacket This will usually be about 1 4 inch 6mm from the jacket Fold Pairs into Slots Figure 3 5 Fold each pair over into adjoining slots on bottom end of termination manager Conductor colors must be arranged in the slots as listed below T568B Wiring Application Shown BL OR Pairs Blue Orange conductors on top BR GR Pairs both White conductors on top T568A Wiring Application BL GR Pairs Blu...

Страница 11: ...rs to perform this task 10 Using the D 914 punch tool with M110 blade on HI impact setting punch down conductors making sure the tool is straight and that conductors fully engage in the IDC terminals Stagger the punch down tool up and down so that it stays in alignment with the staggered terminal slots Recommendations to Aid Assembly 1 The termination manager should be snapped onto the rear housin...

Отзывы: