Appendix D
Cable installation and power separation guidelines
ONECELL
®
RP5200 Hardware Installation, Release 5.5
D-9
DR
AF
T
7
An extra piece of foil can be used to cover the foil seam.
8
For an HGS620 termination, wrap the drain wire at least two times around and
position it where the spring clips will capture them.
9
Tape over the foil for stability.
10
Trim the wire ends.
Содержание ONECELL RP5200
Страница 5: ...Contents ONECELL RP5200 Hardware Installation Release 5 5 v DRAFT ...
Страница 8: ...List of tables viii M0304AG 5 5 01 April 2021 DRAFT ...
Страница 10: ...Document revision history x M0304AG 5 5 01 April 2021 DRAFT ...
Страница 20: ...Chapter 1 CommScope ONECELL overview 1 6 M0304AG 5 5 01 April 2021 DRAFT ...
Страница 39: ...Chapter 2 RP5200 installation ONECELL RP5200 Hardware Installation Release 5 5 2 19 DRAFT ...
Страница 40: ...Chapter 2 RP5200 installation 2 20 M0304AG 5 5 01 April 2021 DRAFT ...
Страница 46: ...Chapter A Safety A 6 M0304AG 5 5 01 April 2021 DRAFT ...
Страница 50: ...Appendix B Installation troubleshooting B 4 M0304AG 5 5 01 April 2021 DRAFT ...
Страница 70: ...Appendix D Cable installation and power separation guidelines D 18 M0304AG 5 5 01 April 2021 DRAFT ...
Страница 71: ...ONECELL RP5200 Hardware Installation Release 5 5 B ...
Страница 72: ...ONECELL RP5200 Hardware Installation Release 5 5 M0304AG 5 5 01 April 2021 DRAFT ...