Page 18 of 22.
© 2020 CommScope, Inc.
TC-96292-IP
3.9 Grounding Frame, Installing Gang Plates
shows the location of the #10-32 ground studs on the rear of the Flex Frame. The
studs are intended for a ground strap with a 2-hole lug with 5/8-inch hole spacing. Fasten the
ground straps between the frame and the adjacent cable manager as shown in
. Ground with AWG 6 wire, conforming to local standards,
Figure 18. Grounding the Frame
Fasten ground straps between the frame and the cable manager as shown in
. If
assembling frames in a lineup, fasten gang plates to adjacent cable management accessory rails
to aid alignment. Assemble as shown, using #12-24 screws.
Note:
For an exploded view of a gang plate installation, see
.
27221-A
#10-32
GROUND
STUDS
5/8-INCH
HOLE
SPACING
#10-32
GROUND
STUDS
5/8-INCH
HOLE
SPACING
REAR OF FRAME WITH CABLE MANAGERS
SEISMIC FRAME