GE 300
4. Cabling
3.2/0617
13
4. Cabling
Mounting, cable run
Overview mounting and cable run GE 300, GE 300WR, GEZ 300, GEI 300
GEZ 300
GE 300
/
2
4
/
4
/
A
B
C
D
GEI 300
SW2
+24 V
–
M3
Expansion
housing
RJ11 socket
Cable bearer
Cable clamp NAK 100
Cable
tie
Grounding point
for wrist strap
grounding
20 – 120 mm (0.8 – 4.7 inch)
max. 120 mm (4.7 inch)
110 cm
(43.3 inch)
140 cm
(55.1 inch)
290 mm (11.4 inch)
306 mm (12.1 inch)
1
80 mm (7
.1 inch)
206 mm (8.1 inch)
24 VAC
supply
Analogue
Digital
Analogue
Snap ferrite
Snap ferrite
min.
120 mm
(4.7 inch)
*1
Mounting option 1: Snap ferrite
inside the housing
*2
Mounting option 2: Snap ferrite
outside the housing
*3
Protection against contact acc. to
IEC/EN 60950-1: For installation in
the operator access area, the
housing cover has to be screwed
onto the housing.
For further information
*2
*1
*2
*3
*3
*3
*3