a minimum free area of 1 square inch per 4,000 Btu
(645 mm² per 1.17kW) per hour of total input rating of all
equipment in the enclosure (see Figure 6 and Figure 9).
It is also permissible to bring in air for combustion from a
ventilated attic (Figure 7) or ventilated crawl space (Figure
Figure 5.
Equipment in Confined Space - All Air from
Inside
Figure 6.
Equipment in Confined Space - All Air from
Outside
When communicating with the outdoors through horizontal
ducts, each opening shall have a minimum free area of 1
square inch (645 mm²) per 2,000 Btu (.56 kW) per hour of
the total input rating of all equipment in the enclosure. See
When ducts are used, they shall be of the same cross-
sectional area as the free area of the openings to which
they connect. The minimum dimension of rectangular
air ducts shall be no less than 3 inches (75 mm). In
calculating free area, the blocking effect of louvers, grilles,
or screens must be considered. If the design and free area
of protective covering is not known for calculating the size
opening required, it may be assumed that wood louvers
will have 20to 25 percent free area and metal louvers and
grilles will have 60 to 75 percent free area. Louvers and
grilles must be fixed in the open position or interlocked
with the equipment so that they are opened automatically
during equipment operation.
Ventilation Louvers
Inlet Air
(Minimum 12 in.
(305mm) above
Attic Floor)
Roof Terminated
Exhaust Pipe
Furnace
*Intake Debris
Screen
(Provided)
* See Maximum Vent Lengths table
NOTE:
The inlet and outlet air openings shall each have a free area
of at least one square inch per 4,000 Btu (645mm
2
per 1.17kW) per
hour of the total input of all equipment in the enclosure.
Figure 7.
Equipment in Confined Space
(Inlet Air from Ventilated Attic and Outlet Air to
Outside)
Roof Terminated
Exhaust Pipe
Furnace
Ventilation
Louvers
(Crawl Space)
*Intake Debris Screen Provided
Inlet Air
Minimum
12 in. (305mm)
above Crawl
Space Floor
Coupling or
3 in. to 2 in.
Transition
(Field Provided)
* See Maximum Vent Lengths table
NOTE:
The inlet and outlet air openings shall each have a free area
of at least one square inch per 4,000 Btu (645mm
2
per 1.17kW) per
hour of the total input of all equipment in the enclosure.
Figure 8.
Equipment in Confined Space
(Inlet Air from Ventilated Crawl Space and Outlet Air
to Outside)
Содержание GDD92A
Страница 31: ...507714 01 Page 31 of 52 Issue 1716 Figure 52 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC...
Страница 36: ...507714 01 Page 36 of 52 Issue 1716 045 3 110 5 090 4 070 3 Figure 59 Typical Wiring Diagram For GDD92A...
Страница 37: ...507714 01 Page 37 of 52 Issue 1716 045 3 110 5 090 5 070 3 Figure 60 Typical Wiring Diagram For GDD95A...
Страница 50: ...507714 01 Page 50 of 52 Issue 1716 Start Up Performance Checklist...