Exhaust through Crawl Space Vent Option
All 33” condensing gas furnaces (92%+) are now approved
to be vented down through a crawl space. Ensure a vent
pipe drain kit, 51W18 (USA) or 15Z70 (Canada), is used as
directed through the floor joists and into the crawl space.
See the following figures.
Consult the vent tables for vent lengths and approved
materials.
2” or 3”
Sanitary Tee
1/2” PVC
Drain Stub
Drain Trap
Assembly
Rubber Boot (51W18)
Drain Plug (15Z70)
Clamp
(51W18 Only)
From
Furnace
To Vent
Termination
Drain Trap
(assembled)
Figure 42. Kit 51W18 (USA) / 15Z70 (Canada) Parts
Identification and Assembly
Exhaust from
Furnace
To Termination
Exhaust from
Furnace
To Termination
* Kit 51W18 is shown.
Figure 43. Crawl Space Vent Pipe Drain Trap
Assembled Incorrectly
Figure 44.
Upflow or Downflow Furnace with Exhaust through Crawl Space
KIT 51W18 (USA)
Basement Floor
To Termination
1/2” PVC to
Code-Approved
Drain
24” max.
Downflow Furnace
Exhaust
KIT 15Z70 (Canada)
* Kit 51W18 is shown.
NOTE:
Upflow furnaces exhaust from the left side. All dimensions shown are typical for upflow or downflow furnaces.
NOTE:
All horizontal runs of exhaust pipe must slope back toward the kit a minimum of 1/4” (6mm) for each 12” (305mm) to ensure drainage.
Содержание Century GDD95C Series
Страница 30: ...507735 03 Page 30 of 53 Issue 1933 Figure 50 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Страница 36: ...507735 03 Page 36 of 53 Issue 1933 045B3 070B4 090C4 110C5 Figure 57 Typical Wiring Diagram ...
Страница 48: ...507735 03 Page 48 of 53 Issue 1933 Troubleshooting Heating Sequence of Operation ...
Страница 49: ...507735 03 Page 49 of 53 Issue 1933 Troubleshooting Heating Sequence of Operation continued ...
Страница 50: ...507735 03 Page 50 of 53 Issue 1933 Troubleshooting Cooling Sequence of Operation ...
Страница 51: ...507735 03 Page 51 of 53 Issue 1933 Troubleshooting Continuous Fan Sequence of Operation ...