C
X
B
Y
D
11
(3)
20
A
Vertical reference line
(1)
(2)
INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step,
proceed with the following drawings:
Mark Points:
A veritcal line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
The cooker hood should be placed
A
) up from the cooking
plane for safe and a good effect.
A horizontal line
B
at a minimum
above the cooker top.
A horizontal line
C
at a inch above the
B
.
A horizontal line
D
at
Mark a point
(1)
on the horizontal line
D
,
to the vertical reference line.
Repeat this operation on the other side, checking that the three marks are leveled.
Mark a point
(2)
on the horizontal line
C
,
to the vertical reference line.
Repeat this operation on the other side, checking that the three marks are leveled.
Mark a point
(3)
on the horizontal line
B
,
Repeat this operation on the other side, checking that the three marks are leveled.
( horizontal line
to the vertical reference line.
above the cooker hood.
37.8''-41.73''
2.36"
2.36"
3.15''
2
3
4
6
7
8
9
10
11
25.6''-29.53''
Chimney
X
Y
X
Y
21
11
12
10
(
2.36''
)
(
3.15''
) (
3.15''
)
(
2.36''
) (
2.36"
)
(
2.36''
)
(
37.8''
-
41.73''
)
25.6''
-
29.53''
4
.69''
15.75"
+
15.35''
17.64''
-
30.83''
7
Содержание CVG30W9AST
Страница 2: ......
Страница 5: ...B A 11 38 12 05 11 34 19 69 25 6 29 53 3 A B CVG30W9AST CVG36W9AST 30 35 4 13 11 11 89...
Страница 16: ...P N 16173000A20369...