background image

ProCenter CTR101-1 

 

Manual Supplement 

MS-CTR101-1 

Page 2 of 2 

Issue Date: June  2003 

 

MicroBlaster Abrasive Hose and Vent Hose Connections 

 

ESD Control ProCenters are equipped with ESD Control handpieces, which are installed in the ProCenter.  
MicroBlasters prepared for use with the ESD Control ProCenter are shipped without the standard handpieces 
and have their abrasive and vent hoses cut to proper length for installation.  Refer to the following drawings 
for correct hose connections. 
 
     Note: When routing abrasive or vent hoses, avoid sharp bends to prevent excessive hose wear.   
 
If you are connecting a MicroBlaster that has the standard handpiece(s) installed,  remove the handpiece(s) 
and trim the hose lengths to form a 4-5” diameter loop exiting the fittings on the back of the blaster.  Allow a 
smooth path to the connection points on the ProCenter. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Single Tank

MicroBlaster

Dual Tank 

MicroBlaster

Содержание ESD Control ProCenter CTR101-1

Страница 1: ...gohm resistor to a banana plug that should be plugged into one of the grounding receptacles located at the right rear corner of the work chamber area It is recommended that as many connectors as possible on the target board be grounded The needle probe WS2021 is used to pierce through the conformal coating to ground a target trace when the defect is known to be an open trace with no conductive pat...

Страница 2: ...and have their abrasive and vent hoses cut to proper length for installation Refer to the following drawings for correct hose connections Note When routing abrasive or vent hoses avoid sharp bends to prevent excessive hose wear If you are connecting a MicroBlaster that has the standard handpiece s installed remove the handpiece s and trim the hose lengths to form a 4 5 diameter loop exiting the fi...

Страница 3: ...is adjusted at the factory and should not require any further adjustment The airflow should be adjusted to achieve a light even flow of air over the work area inside the work chamber If the dust collection motor is unplugged during checking of the airflow a better feel of the airflow can be obtained If adjustment is required the regulator is located behind the electrical compartment access panel o...

Страница 4: ...003 HANDPIECE ASSEMBLY ESD CONTROL WS2030 2 Hi Performance Conductive Nozzle Selection Chart Part Number Nozzle Opening ID Color MB1520 24C 018 Violet MB1520 11C 030 Green MB1520 29C 046 Yellow MB1520 39C 060 Red For Complete ESD Handpiece Assembly as shown Order Part No WS2030 2 ...

Страница 5: ...ProCenter CTR101 1 Manual Supplement MS CTR101 1 Page 5 of 5 Issue Date June 2003 ELECTRICAL WIRING DIAGRAM ESD CONTROL SYSTEM 115V 60 Hz CTR101 1 ...

Страница 6: ...ProCenter CTR101 1 Manual Supplement MS CTR101 1 Page 6 of 6 Issue Date June 2003 ELECTRICAL SCHEMATIC DIAGRAM ESD CONTROL SYSTEM 115V 60 Hz CTR101 1 PNEUMATIC DIAGRAM ESD CONTROL SYSTEM ...

Отзывы: