![COMBA RXA3748 Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/comba/rxa3748/rxa3748_user-manual_2639095040.webp)
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 40
INSTALLATION GUIDE FOR RX-7W22, II2
It is mainly used to record device location and Date/Time provides a time reference. Clicking the Config
Value of Date/Time will update the Date/Time automatically.
NOTE: Make sure the device is connected with appropriate donor and service antennas before
proceeding to step 4.
Figure 30: Commissioning Procedure
– Isolation Detection
Select a frequency band (RFU) that needs to be commissioned.
Click
to start Isolation Detecting, then a [Confirm] window will pop-up.
Click
to continue. If isolation detection passes, the process will go to the RF Settiing Screen
shown as Figure 38. If failed, a Tips window will pop-up, users need to check whether the system
isolation is adequate.
NOTE:
At the end of the first frequency band commissioning, users can start other frequency band
commissioning.
Figure 31: Commissioning Procedure
– Isolation Detection Confirm
Step 4:
Click
to enter to Isolation Detection Screen.