background image

USER MANUAL FOR COMFLEX-6Q00 5W

 

 

ENU STATUS: 1-0-1 

Copyright - refer to title page 

Page 67 

 

 

 

 

7.2 

APPENDIX B: RMA (RETURN MATERIAL AUTHORIZATION) 

 

 

End of Section 

 

End of Document 

 

FOR NAM OFFICE EMAIL, PLEASE INSERT: 

[email protected]

 

 

Содержание COMFLEX Series

Страница 1: ...USER MANUAL FOR COMFLEX 6Q00 5W COMFLEX 6Q00 5W COMFLEX SERIES DISTRIBUTED ANTENNA SYSTEM USER MANUAL COMFLEX 6Q00 5W QE 1 0 1 _ _ __ __ __ ___ __ _ ___ ____ _ __ __ _...

Страница 2: ...USER MANUAL FOR COMFLEX 6Q00 5W COMFLEX 6Q00 5W QE COMFLEX SERIES DISTRIBUTED ANTENNA SYSTEM MANUAL A 2018 06 21...

Страница 3: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 3 DISTRIBUTED ANTENNA SYSTEM USER MANUAL ComFlex 6Q00 5W QE 1 0 1 Comba Telecom Inc ComFlex 6Q00 5W...

Страница 4: ...n which vests in Comba International Comba All rights reserved The information contained herein is confidential and the property of Comba and is supplied without liability for errors or omissions No p...

Страница 5: ...2 SITE PLANNING CONSIDERATIONS 17 3 3 INSTALLATION PROCEDURES 18 3 4 EQUIPMENT CONNECTORS 29 3 5 EQUIPMENT CONNECTION 32 4 COMMISSIONING 36 4 1 PRE COMMISSIONING TASKS 36 4 2 LED INDICATORS 37 4 3 DI...

Страница 6: ...29 Figure 24 MU Rear Panel Connectors 29 Figure 25 4 3 10 Female Dimension 30 Figure 26 RU Connectors 31 Figure 27 MU Grounding MU Rear Panel 32 Figure 28 RU Grounding 33 Figure 29 Fiber Optical and R...

Страница 7: ...ng Procedure Params Setting 57 Figure 68 Flow to select 57 Figure 69 Calibration 2500 TDD Band Certer Freq 58 Figure 70 Commissioning Procedure Calibration 59 Figure 71 Commissioning Procedure MU Setu...

Страница 8: ...MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 6 0 3 HISTORY Change No ENU Details of Change 1 1 0 0 Initial released in Jun 2018 2 1 0 1 Deleted MIMO related descript...

Страница 9: ...Mobile Terminal MTBF Mean Time Between Failures MU Master Unit NC Normally Closed NF Noise Figure NO Normally Open OMC Operation Maintenance Center OMT Operation Maintenance Terminal OP Optical Fiber...

Страница 10: ...g operation Note Antennas feeders and couplers are not included in the packing list solution provider should consider these accessories according to site conditions WARNING Antenna gain should not exc...

Страница 11: ...nd approved antennas cables and or coupling devices The use of unapproved antennas cables or coupling devices could cause damage and may be of violation of FCC regulations The use of unapproved antenn...

Страница 12: ...ow signal transmission loss of optical fiber is applicable for long distance transmission ComFlex can support the optical transmission of up to 6 5dBo optical loss equivalent to 8 miles fiber length M...

Страница 13: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 11 Figure 2 Remote Unit RU End of Section...

Страница 14: ...ia optical fiber The Optical TX RX Module of RU converts the DL optical signals into RF signals After amplification the signals are transmitted at the MT port to the service antenna On the UL the sign...

Страница 15: ...er Optical Unit FOU completes optical signal and RF signal conversion One FOU has four optical ports which means each FOU can support up to four RUs MU01 RFU Master Unit RF Unit completes separation a...

Страница 16: ...2 4 KIT OF PART Table 3 Master Unit MU KOP Item Qty Image MU Chassis 1 RF Unit RFU 1 8 Fiber Optical Unit FOU 1 2 Power Supply Unit PSU 1 Power Supply Cable 13 Feet 1 inch 1 Communication Cable 1 Righ...

Страница 17: ...C cable and 13 feet 1 inch AC cable 1 Mounting Rack for RU wall mounting 1 Masonry Bolt set M8x80 for RU concrete wall mounting 4 Masonry Bolt set M8x80 for PSU concrete wall mounting 2 Nuts M6x10 Spr...

Страница 18: ...t involving installation operation or maintenance must be free from danger as far as reasonably possible Where there is a risk of damage to electrical systems involving adverse weather extreme tempera...

Страница 19: ...ic sources such as large electrical equipment Environmental Humidity has an adverse effect on the reliability of the equipment It is recommended to install the equipment in locations having stable tem...

Страница 20: ...n feeder cable by minimizing the length and number of RF connections Ensure the equipment will be operated within the stated environment refer to datasheet Where needed couple BTS RF signal with a cou...

Страница 21: ...usually 10 times the cable s outer diameter In the case of single optical fiber that is not in a cable the minimum bending radius to be observed is 3cm 1 2 3 3 4 MU ASSEMBLING ComFlex Master Unit cons...

Страница 22: ...llation Remove FOU slot cover plate on Chassis insert FOU and fasten the screws Each Unit can be installed in either one of two FOU slots Figure 7 FOU Installation Step3 PSU installation Remove PSU sl...

Страница 23: ...ble clip connect output cable and ground cable to MU Figure 9 Backup PSU Installation 1 MU Figure 10 Backup PSU Installation 2 3 3 5 MU IN 19 RACK MOUNTING MU is an indoor type device the installation...

Страница 24: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 22 Figure 10 Mounting Rack Figure 11 Angle Iron Installation...

Страница 25: ...US 1 0 1 Copyright refer to title page Page 23 Step2 Slide the MU on to the angle brackets and confirm it is level Figure 12 MU Installation Step 3 Attach the MU onto the rack with the recommended rac...

Страница 26: ...rding to the following criteria General surroundings If mounting on dry wall 0 75 In min plywood backboard is required to support the weight of the equipment Ventilated and easy to reach area for main...

Страница 27: ...6 65 in 169mm 600mm Figure 15 Wall Drilling Dimensions of MRU Step 3 Attach the mounting rack on a wall If a concrete wall use the 2 M8 80 masonry bolts Bolts are provided lag bolts or screws are not...

Страница 28: ...e 26 Step 4 Ensure the antenna and other connectors are facing down hang RU onto semicircle slot of mounting rack Figure 17 Hang RU onto the Mounting Rack Step 5 Tighten the bottom two M8 80 masonry b...

Страница 29: ...unting rack Figure 19 Tighten Two Hexagon Screws 3 3 7 PSU INSTALLATION RU Power Supply Unit should be installed after the RU is mounted RU Power Supply Unit can be installed in two ways attached to R...

Страница 30: ...feet 1 inch 14 96 in 4 37 in 111mm 380mm Figure 21 Wall Drilling Dimensions of PSU Step 2 Attach the PSU on the wall with two M8 80 hexagon screws Screws are provided Figure 22 Install PSU on the Wal...

Страница 31: ...FLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 29 3 4 EQUIPMENT CONNECTORS The figures below present the connectors of ComFlex MU Figure 23 MU Front Panel Connectors Figure 24 MU Rea...

Страница 32: ...9 Grounding connector 10 FOU Expansion FOU communication connector 11 POI POI communication connector 12 AUX Expansion unit communication connector 13 MODEM Optional modem unit communication connector...

Страница 33: ...ections Identifier Functional Description ANT 4 3 10 connector antenna system connection port OP SC APC optical fiber access port EXT_ALM External alarm port It provides an alarm report interface for...

Страница 34: ...ws screws are provided Connect the other side of the supplied copper wire GND cable to the building EARTH with two M6 screws screws are not provided Step 2 Connect one side of the supplied copper wire...

Страница 35: ...Mode fiber with SC APC connectors MAXIMUM OPTICAL LOSS 6 5dBo Step 2 For duplex application connect the MU RFU TX RX port to the RF Source BTS or BDA using 50Ohm coaxial cable For simplex application...

Страница 36: ...one of the OP port located on MU FOU front panel Step 2 Connect ANT port to a broadband antenna using 50Ohm coaxial cabel Note coaxial cable must be mini Din male on the RU side antenna shoule be 50O...

Страница 37: ...he enclosure Figure 33 Pins Allocation for EXT_ALM Port for RU Table 7 Pin Definition of EXT_ALM Port for RU Pin number 1 2 3 4 Alarm definition EXT Alarm 1 GND EXT Alarm 2 GND Note Users need to conf...

Страница 38: ...rnet cable to achieve local monitoring and management End of Section 4 COMMISSIONING 4 1 PRE COMMISSIONING TASKS After equipment installation perform the following steps before equipment powering and...

Страница 39: ...s the receiving optical power is less than 10dBm Table 10 RU LED Indications LED Indicator Normal Status Indication PWR Steady green Power indicator If LED is off it indicates the system has no power...

Страница 40: ...y tube on optical module has two digits The first digit will display A b C and d which presents the No of optical port Refer to below figure for the relationship The second digit will display the opti...

Страница 41: ...he supplied Ethernet cable to set up a physical connection Step 2 Go to laptop Control Panel Network and Internet Local Area Connection Right click it and click Properties Then follow the steps shown...

Страница 42: ...ght refer to title page Page 40 Figure 39 Input User Name and Password 5 2 WEB GUI INTRODUCTION After login the Web GUI main screen will appear Figure 40 Web GUI Main Screen On Comba Web GUI Home page...

Страница 43: ...ion diagram of MU and RU Figure 41 Devices Sceen MU Main Management Screen Figure 42 MU Device Monitoring Unit Click here for MU main management page Click here for RU main management page Click here...

Страница 44: ...Unit FOU port number Optical loss between MU and RU the value is over 16dB when MU and RU are not connected well Optical power alarm Alarm is triggered when optical power is less than 10dBm Indicator...

Страница 45: ...old 39dBm for MRU software will trigger Recovery It will reset PA and then re detect the PA output power and reflected power if they are normal the PA Service Status will turn to Normal if PA output p...

Страница 46: ...A work flow of the commissioning process is shown on Auto Setup page Click the Start button the software will guide you through the commissioning step by step For details please refer to chapter 5 3 F...

Страница 47: ...CTION Other parameters can be configured on Function page There are fifteen function bars list in the left side of the Mangement page Below figures are the introduction of each function bar Devic Info...

Страница 48: ...ice Parameter MU Alarm Enable RU Alarm Enable ATT value ATT value RF Switch RF Switch SNMP parameter Over temperature alarm threshold DL over output power threshold External Alarm level Import and Exp...

Страница 49: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 47 Summary Figure 50 Function Summary Comm Setting Figure 51 Function Comm Setting SNMP...

Страница 50: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 48 Figure 52 Function Comm Setting UDP IP Setting Figure 53 Function IP Setting...

Страница 51: ...ge Page 49 Note For remote monitoring the IP Address must be set correctly according to the location IP of remote connection If there is more than one equipment is connected to the public network thro...

Страница 52: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 50 Scan Figure 54 Function Scan Figure 55 Function After Scan...

Страница 53: ...page Page 51 Device Remove Figure 56 Function Device Remove Note If the RU has been scanned and identified by MU to remove the RU from the system users must remove this RU on this Remove page otherwi...

Страница 54: ...fer to title page Page 52 New Site Report Figure 57 Function New Site Report PA Reset Figure 58 Function PA Reset Note PA will be turned off by software when PA output power or VSWR reflected power is...

Страница 55: ...Copyright refer to title page Page 53 Device Reset Figure 59 Function Device Reset Note Device Reset process will last about 2 4 minutes For MU monitor reset users need to re login WEB GUI Clear Hist...

Страница 56: ...ring Upgrade Swap and Module Upgrade Monitoring Upgrade is used to upgrade software Swap is to replace current firmware version to the previous one Module Upgrade is used to upgrade module software Fi...

Страница 57: ...Page 55 WebOMT Setting Figure 63 Function WebOMT Setting 5 3 COMMISSIONING PROCEDURE To complete the installation and commissioning users need to follow the steps below Step 1 Click Menu bar Auto Setu...

Страница 58: ...l take about 1 minute Figure 65 Commissioning Procedure Device Scan Step 3 Go to Home page click RU config the Working Mode of 2500 TDD to DL Normal Open Figure 66 Commissioning Procedure 2500 TDD wor...

Страница 59: ...arams Setting Dev Info mainly used to record device location and Date Time provid a time reference Mouse clicks the Config Value of Date Time to auto receive the computer time Step 5 Click to enter to...

Страница 60: ...step of MU and RU setup but the system gain will be a little deviation with normal valuer so the final output power will be not same with the target DL output power NOTE Make sure all the ANT ports of...

Страница 61: ...Commissioning Procedure Calibration Automatic calibration no needs to select frequency band the system will calibration all the band automatically If users choose Manual calibration then go to next pa...

Страница 62: ...n Figure 73 Figure 71 Commissioning Procedure MU Setup Note RU Setup includes Remark RF Switch DL Input Power Figure 72 Commissioning Procedure RU Setup Note RU Setup includes RF Switch Target DL P_ou...

Страница 63: ...wer level each channel will reach it s rated power so the total output power will be input A gain inputB gain inputN gain For example if there are two 1900MHz bands acess to MU each has 10dBm input po...

Страница 64: ...80 by default Optical Tx Alarm Alarm when Optical Transmiting power is lower than the threshold otherwise normal Alarm judgment period 3 minutes by default Alarm threshold 7dBm by default Optical Rx A...

Страница 65: ...efault Alarm threshold 0dBm by default Optical Rx Alarm Alarm When optical receiving power is lower than the threshold otherwise normal Alarm judgment period 3 minutes by default Alarm threshold 14dBm...

Страница 66: ...imatic protection to the system under severe environment Optical TX Alarm Test MU transmit optical power Replace FOU if transmit optical power is less than 7dBm Optical RX Alarm Clean optical cable co...

Страница 67: ...power If received optical power is lower than 14dBm test whether MU transmit optical power is normal 4 2dBm Check if optical loss of fiber link is higher than 6 5dBo DL PA alarms Check PA Service Sta...

Страница 68: ...APPENDIX A TOOLS FOR INSTALLATION AND MAINTENANCE The following tools not included in package are required for installation or routine maintenance Power Drill for wall mount Adjustable Wrench 0 31 in...

Страница 69: ...COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 67 7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION End of Section End of Document FOR NAM OFFICE EMAIL PLEASE INSERT support us co...

Страница 70: ...USER MANUAL FOR COMFLEX 6Q00 5W ENU STATUS 1 0 1 Copyright refer to title page Page 68...

Отзывы: