background image

USER MANUAL FOR RX-2620 

 

 

 

ENU STATUS : 1-0-0 

Copyright - refer to title page 

Page 23

 

 

 

Table 7: Commissioning 

Commissioning Tasks 

Observation 

1.  On-line and Inquiry status 

z

  Activate the OMT Main window. The system Initialization will 

completed in about 2 minutes.  

z

  Click “Connect” button to enquire the repeater’s status. Proceed if 

there is no alarm; else check the failure and attend to the alarm. 

2.  Set Channel No. 

 

z

  Keep RF switch ON and set the channel number of the repeater’s 

operating frequency. 

3.  Adjust Downlink Output 

Power and align donor 
antenna 

z

  Observe DL input power from measured value. Align the direction 

of donor antenna until the DL input power reading is maximized. 

z

  Note: To ensure that the measured DL input power is accurate, one 

should set the DL ATT to “0” before performing the check. 

4.  Configure [Equipment ID] 

z

  Go to [Properties Info] and set [Equipment ID]. 

5. Comm. Config 

z

  Enable the power supply by selecting “On” in [RF] -> [Switch]; go to 

[Properties Info.] -> [Comm. Config.] and set OMC Phones No. , the 
service No. of SMSC, Report Mode. 

6. Select Monitoring 

Parameters 

z

  Select the equipment controlled and monitored parameters. 

z

  If the external devices are connected to the equipment for 

management, please enable in the [External Alarm Info.] Interface. 

7.  Test coverage area field 

intensity and adjust 
service antenna. 

z

 

Use test-handset to verify field intensity within the coverage area. If 
needed, realign the service antenna to achieve the desired 
coverage. 

z

 

Note: If during operation, the equipment gain could not be set to 
maximum or the output power is not high enough due to insufficient 
donor and service antennas isolation, then the antennas’ position 
should be changed to increase isolation. If the output power is too 
high and ALC is activated, then adjust the DL ATT to achieve 
optimal DL Gain.  

8.  Verify UL gain and ensure 

test call produces good 
voice quality and there is 
no interfering BTS 

z

 

Adjust UL gain and perform test calls. Typically, the UL gain is set 
around 5dB less than DL gain. Perform test calls in the coverage 
area while adjusting UL gain if required.  

z

 

Note: If the repeater is near the BTS and the test call performance 
is poor, this may be due to UL noise interference to the BTS. Users 
can calculate and determine if the repeater UL noise will interfere 
with the BTS. 

z

 

Verify again that there is no unacceptable interference to BTS. 

 

 
 
 

 

End of Section 

Содержание RX-2620

Страница 1: ...L LT TE E W WI IR RE EL LE ES SS S R RE EP PE EA AT TE ER R USER MANUAL RX 2620 QE 1 0 0 Comba Telecom Ltd RX 2620...

Страница 2: ...Comba International Comba All rights reserved The information contained herein is confidential and the property of Comba and is supplied without liability for errors or omissions No part may be repro...

Страница 3: ...MOUNTING OF MOUNTING RACK 17 3 3 6 DRIP LOOP 17 3 4 EQUIPMENT CONNECTORS 18 3 4 1 CONNECTORS 18 3 4 2 GROUNDING CONNECTION 19 3 4 3 LI ION BATTERY CONNECTION 19 3 4 4 RF CONNECTION 19 3 4 5 EXTERNAL A...

Страница 4: ...10 LEDs 21 Figure 11 PC Protocol Setting 24 Figure 12 Connection Type 1 25 Figure 13 Connection Type 2 25 Figure 14 Remote Connection 26 Figure 15 OMT Main Window 26 Figure 16 Switch 27 Figure 17 ATT...

Страница 5: ...OR RX 2620 ENU STATUS 1 0 0 Copyright refer to title page Page 5 0 3 HISTORY Change No ENU Details Of Change 1 1 0 0 RX 2620 user manual first created in Aug 2012 and referred to its Chinese manual RX...

Страница 6: ...al GSM Global Standard for Mobile Communication Hz Hertz ID Identification LNA Low Noise Amplifier MCU Main Control Unit MHz Megahertz MT Mobile Terminal MTBF Mean Time Between Failures NF Noise Figur...

Страница 7: ...supplemented by safety notices in the appropriate equipment manual These notices contain additional information on the nature of the hazard and may also specify precautions Warning These draw the att...

Страница 8: ...er detect functions easy for installation Automatic gain temperature compensation function which can maintain regular operation among working temperature It supports the remote download of monitoring...

Страница 9: ...USER MANUAL FOR RX 2620 ENU STATUS 1 0 0 Copyright refer to title page Page 9 The following figure shows the enclosure of the RX 2620 420 330 182 Figure 1 Views of RX 2620 Enclosure End of Section...

Страница 10: ...igure 2 RX 2620 System Diagram As shown in the above figure the downlink BS signals go through DT port to the system and then to downlink by duplexer separation The DL signals will go through LNA then...

Страница 11: ...fier Functional Description Power Supply Unit PSU Converts the input voltage into a stable DC to provide power for the internal functional modules and to charge the internal Li ion battery Power Ampli...

Страница 12: ...ier Description Quantity RX 2620 manual This equipment manual on CD Rom 1 CPC Connector X14J7P 1 Ethernet Cable 2m 1 Modem Antenna XD WCDMA 1 Masonry Bolt M8x80 4 U Bolt with 2 nuts flat washer spring...

Страница 13: ...verse weather extreme temperatures wet corrosive or dirty conditions flammable or explosive atmospheres the system must be suitably installed to prevent danger Protective Earthing Equipment provided f...

Страница 14: ...ation location for the product should be well ventilated The equipment has been designed to operate at the temperature range and humidity level as stated in the product specifications in the datasheet...

Страница 15: ...nsit is the responsibility of the agent z Open and check each package against the packing list If any items are missing please contact Comba z Do not remove items from antistatic packing until ready f...

Страница 16: ...Mounting rack as a guide z Insert the masonry bolts through the round holes and tighten them to take the weight of the entire enclosure z Hook the enclosure up onto the mounting rack and align the ho...

Страница 17: ...ng rack onto the pole z The remaining installation to secure the enclosure to the mounting rack is identical to wall mounting U Bolt Pole Mounting Rack M8 Hex Socket Bolt Figure 6 Pole Mounting Overvi...

Страница 18: ...ctor for external mobile antenna DT N female connector for external donor antenna EXT_ALM 7 pin CPC connector for external alarm interface POWER1 Power supply interface MODEM ANT SMA F connector conne...

Страница 19: ...the system integrated module and MCU and connect the connectors as illustrated below after system commissioning to ensure the alarm message could be sent to OMC effectively in case of mains power fail...

Страница 20: ...er off and Li ion battery output connector is disconnected 3 4 7 EXT ALARM CONNCETION The EXT ALARM port is a 7 pin CPC connector The following figure and table show the pin allocation and definition...

Страница 21: ...ng connection and verify that the ground resistance is less than 5 Connect the equipment to the PC installed with OMT software Check antenna system return loss which working frequency band return loss...

Страница 22: ...uiry Status External Alarm Yes Enable External Alarm and Configure Voltage applied to EXT Alarm Set Channel NO Adjust Downlink ATT and Measure Downlink Output Power Signal Input Exit from OMT Remote C...

Страница 23: ...t controlled and monitored parameters z If the external devices are connected to the equipment for management please enable in the External Alarm Info Interface 7 Test coverage area field intensity an...

Страница 24: ...ftware with remote connection to the equipment over wireless GSM CDMA network is optional for customers 5 1 LOCAL AND REMOTE CONNECTIONS TO OMT After installing OMT software on the PC connection to th...

Страница 25: ...nection via Ethernet UDP for connection Figure 12 Connection Type 1 Figure 13 Connection Type 2 After clicking ONLINE a window will pop up for user configuring IP Address and Port No Table 8 IP Settin...

Страница 26: ...nected remotely Notice Please enable the SIM card to support Circuit Switch Data 5 2 OMT CONFIGURATION After entering the OMT main screen click the Connect button on the toolbar to connect the equipme...

Страница 27: ...finish the configuration operation 5 3 2 ATT ATT adjustment includes UL DL ATT adjustment The purpose of adjusting the ATT is to adjust system gain DL UL ATT 01setting range 0 30dB Figure 17 ATT Conf...

Страница 28: ...nfig button to finish the configuration operation 5 3 4 ALARM INFORMATION Alarm information operation is to select alarm parameters for monitoring Alarm parameters include Master Alarm Channel Alarm a...

Страница 29: ...iption Site ID Site ID is the unique equipment identification It is a hexadecimal string of eight characters in the range of 00000000 FFFFFFFF e g 00000000 Site Sub ID Site Sub ID is used for Master S...

Страница 30: ...s the phone number to dial the equipment Only the phone number pre defined in this field will it be allowed to dial the equipment It is required to manually enter the phone number Up to 5 phone number...

Страница 31: ...ment operation status can be observed remotely through OMC Periodic inspection of the repeater equipment s is recommended the recommended tasks includes z Inspect and record operation status and outpu...

Страница 32: ...wing are the recommended list of tools new installation and routine maintenance Slotted screwdriver Philips screwdriver Ring spanner Assorted size 12 20mm Electrically operated drill and masonry drill...

Страница 33: ...USER MANUAL FOR RX 2620 ENU STATUS 1 0 0 Copyright refer to title page Page 33 7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM End of Section End of Document...

Страница 34: ...USER MANUAL FOR RX 2620 ENU STATUS 1 0 0 Copyright refer to title page Page 34...

Отзывы: