7. Step only necessary for the first head
installed: In the installation path of the
application or web interface, enter the
serial number of one of the heads. The
serial number is placed on the label on
the bottom of the head.
8. The other heads automatically appear in
the application as they communicate.
9. Once the heads are set up in the
application, proceed with the assembly
of the heads.
9
19.5
5. Place the heads within 40cm of
the gateway.
6. Turn the ring to wake up each
head next to the gateway.
4. Insert the batteries into the head
a. Slide the handwheel forward
b. Insert the batteries in the direction
indicated in the battery compartment.