Columbia MCB-100J Скачать руководство пользователя страница 23

Da

te

S

e

rvic

e P

e

rf

ormed

C

ompan

y Name & 

T

ech Initials

C

ompan

y A

ddr

ess & Phone #

Содержание MCB-100J

Страница 1: ...ALLATION OPERATION MAINTENANCE MANUAL Models MCB 50J MCB 75J MCB 100J MCB 125J MCB 150J MCB 170J MCB 200J Tested For 100 psi ASME Working Pressure C S A Certified For Natural Gas Or Propane Manufactur...

Страница 2: ...ns Pump size Supply Return Tappings A B C D E F 50 11 5 4 30 36 5 1 75 15 7 5 30 37 5 1 100 15 7 6 30 37 6 1 125 18 9 6 30 37 6 1 150 18 9 7 30 37 6 1 170 22 11 7 30 38 6 1 200 22 11 8 30 38 7 1 Propa...

Страница 3: ...tory equipped supplied or specified components may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INST...

Страница 4: ...nput rate 4 for every 1000 ft 304m above sea level 2 Net AHRI Water Ratings shown based on piping and pickup allowance of 1 15 Consult manufacturer before selecting boiler for installations having unu...

Страница 5: ...practical 7 Allow 24 inches 610mm at front and right side for servicing and cleaning 8 When installed in utility room door should be wide enough to allow largest boiler part to enter or to permit rep...

Страница 6: ...H greater than 0 60 Volume 21 ft3 ACH x Total Input Mbh Refer to National Fuel Gas Code for opening requirements between connection indoor spaces All Outdoor Air Provide permanent opening s communicat...

Страница 7: ...of the relief valve outlet over the entire length of discharge line have no intervening shutoff valve between safety relief valve and discharge to atmosphere do not plug or place any obstruction in di...

Страница 8: ...on 5 Hot water boilers and system must be filled with water and maintained to minimum pressure of 12 psi 6 Bypass piping is optional which gives ability to adjust supply boiler water temperature to fi...

Страница 9: ...NING Burn and scald hazard Safety relief valve could discharge steam or hot water during operation Install discharge piping per these instructions 8 Install discharge piping from safety relief valve S...

Страница 10: ...10 4 CONNECTING SUPPLY AND RETURN PIPING Figure 6 Single Zone System With DHW Figure 7 Multi Zone System With Circulators And DHW...

Страница 11: ...11 4 CONNECTING SUPPLY AND RETURN PIPING Figure 8 Multi Zone System With Zone Valves And DHW With Circulator Figure 9 Multi Zone System With Zone Valves And DHW With Zone Valve...

Страница 12: ...nting system 2 Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion and other deficiencies which could cause an...

Страница 13: ...ocation following installation 5 Thermostat s heat anticipator must be adjusted to match total current draw of all controls associated with boiler during heating cycle 7 VENT DAMPER INSTALLATION INSTR...

Страница 14: ...ping Pressure test boiler and gas connection before placing boiler in operation Pressure test over 1 2 psig 3 5 kPa Disconnect boiler and its individual gas shutoff valve from gas supply system Pressu...

Страница 15: ...at on outside wall 3 Do not install thermostat where it will be affected by drafts hot or cold pipes sunlight lighting fixtures televisions fireplace or chimney 4 Check thermostat operation by raising...

Страница 16: ...M Figure 13 Integrated High Limit Electronic Ignition Control 240008781 WARNING Modification substitution or elimination of factory equipped supplied or specified components may result in personal inj...

Страница 17: ...Appliance and call qualified service technician or your gas supplier TO TURN OFF GAS TO THE APPLIANCE 1 Set the thermostat to lowest setting 2 Turn off all electric power to the appliance if service i...

Страница 18: ...if used to expel any air accumulated in the system Check entire piping system and if any leaks appear have them repaired Circulators need to be checked and maintained Refer to circulator manufacturer...

Страница 19: ...pilot flame Be sure to replace cover screw after adjustment to prevent possible gas leakage See Figure 16 Page 19 Check burners and pilot for signs of corrosion rust or scale buildup Area around boil...

Страница 20: ...water column from specified pressure listed on boiler rating plate Primary air adjustment is not necessary therefore air shutters are not furnished as standard equipment CHECK SAFETY CONTROL CIRCUIT T...

Страница 21: ...lified service agency prior to resuming operation 4 ECONOMY Active Indicates thermal targeting function is active and limit control is reducing boiler temperature to conserve fuel Economy feature is a...

Страница 22: ...NOTES...

Страница 23: ...Date Service Performed Company Name Tech Initials Company Address Phone...

Страница 24: ...COLUMBIA BOILER COMPANY Main offices and factory Pittstown PA...

Отзывы: