LOCATING THE BOILER
Locating the Boiler
1.
Select level location as centralized with piping system,
and as near chimney as possible.
2.
Place crated boiler at selected location. Remove all
crate material. Please recycle responsibly.
WARNING
Fire hazard. Do not install boiler on combustible
fl
ooring or carpeting. Failure to follow these
instructions could result in death or serious injury.
!
3.
Do not install boiler on carpeting. For installation
on non-combustible fl oors only.
For installation on
combustible
fl
ooring, special base must be used. (See
Replacement Parts Manual.)
4.
Use metal shims under boiler base legs for
fi
nal leveling
if needed.
5.
Install boiler in location that permits satisfactory
combustion of gas, proper venting, and maintenance
of ambient temperature at safe limits under normal
conditions of use. Boiler location should not interfere
with proper circulation of air. Introduce outside air
if normal in
fi
ltration does not provide necessary
air. “Fresh Air for Combustion” on page 12 .
6.
Notify owner to keep air passages free of obstruction.
Ventilating and combustion air must enter boiler room
without restrictions.
Table 3 -
Minimum Clearance Dimensions
Top
6"
Rear
6"
Control Side
7"
Opposite Side
6"
Front
Alcove
Flue/Vent
Connector
6"
Near Boiler Piping
1/2"
7.
Install boiler so automatic gas ignition system
components are protected from water (dripping,
spraying, rain, etc.) during appliance operation and
service.
Draft Hood Installation
WARNING
Asphyxiation, carbon monoxide hazard. Failure to
follow these instructions could result in improper
combustion and possible leakage of combustion
products into the living space.
!
Follow directions given in Figure 3. Attach draft diverter,
and blocked vent switch. Mount vent damper. See
"Connecting Vent Damper and Vent Connector" page 13.
See Wiring Diagrams pages 26 and 27.
7”
(178mm)
6” (152mm)
Boiler
Rear
Front
Control Side
Opposite Side
ALCOVE
6”
(152mm)
Figure 2 - Minimum Clearances To Combustible
Construction
Figure 3 - Draft Hood Installation
1.
Slide draft hood over
fl
ue collector.
2.
Through holes in jacket top, secure with 1 or 2 screws,
based on boiler size.
Draft
Hood
Screw
View from top
of boiler
Top and side panels not shown for clarity.