3. Start-up
»
This chapter is directed at the operators of the equipment.
This chapter assumes general skills in dealing with drying systems and SPS
(PLC) control units.
This chapter assumes that the functional description has been read and un-
derstood.
It should be ensured in each and every case that the operators have the rele-
vant skills.
F
Note down all set values of the control system.
Make sure that the cooling appliance is connected to the mains socket in
the electrical cabinet (if present, optional).
Make sure that any condensate penetrating from the cooling appliance
(optional) does not get inside the dryer or the control box.
&
If the inside temperature of the switch cabinet is above +50°C (122 °F),
the dryer is switched off after 30 minutes if it is operated with a cooling
appliance (optional).
If ordered temperature can be displayed in °F !
64.10-0260GB05
06/03
CTT 250
Start-up 3-1
Содержание CTT 250
Страница 80: ...Accessories Spare parts list Drying Hoppers TT 25 TT 6400 GB01 01 03 Colortronic GmbH...
Страница 83: ...GB01 01 03 TT 25 TT 6400 4 15 D 9 10 11 12 13 14 PT 100 1 2 3 4 5 6 7 17 16 8 18 PT 100 A C B...
Страница 86: ...Accessories Entering values on the OP 7 17 Colortronic GmbH 02 01GB...
Страница 92: ...Accessories Flap control with Fuzzy Logic Colortronic GmbH 10 00GB...