Coleman 8330-752 Скачать руководство пользователя страница 4

 

4

5.  CEILING PLENUM INSTALLATION REQUIREMENT 

 

1.  The ceiling plenum must be installed under the roof 

opening. 

 
 

The ceiling plenum bolts below the roof top unit.  
Compression of the framed ceiling cavity between the 
roof top unit and the ceiling plenum is what holds both 
components in place. 

 
2.  Ceiling cavity depth (the measurement from the ceiling to 

the roof – maximum 6”). 

 
3.  The 115 VAC service for the roof top unit must be routed 

into the ceiling plenum.  To prevent wire pinching and to 
promote ease of installation, allowances must be made for 
routing the 115 VAC supply wiring into the front of the 
roof opening. 

 
4.  The wirebox has a 9 pin receptacle extending from the 

front.  This mates with the roof unit 115 volt electrical 
conduit.  When making this connection, verify that the 
plugs are properly aligned and have snapped together 
securely. 

5.  The wirebox for the heat/cool units will have a two pin 

receptacle which mates with the umbilical plug from the 
heater assembly. 

 
6.  LOW VOLTAGE CONTROL WIRING (WALL 

THERMOSTAT) 

 

A.

 

A low voltage terminal strip on the front of the box 
connects to the low voltage control wires.  The wires 
attach by 1/4" quick connects. 

 

B.

 

The low voltage control wiring must be run from the 
wall thermostat mounting location to the wirebox low 
voltage terminals.  To prevent wire pinching and to 
promote ease of installation, allowances must be 
made for routing the low voltage wiring into the front 
of the opening. 

 

 

Standard Control Box 

 
 

 
 

Zone Control Box

 

 

Plenum Terminal  

Designation 

Thermostat Wire  

Connection 

Function of Low Voltage Terminal Extending From Ceiling 

Plenum 

R+ 

Red 

Pr12 VDC to upper unit control box 

Cool Shed 

(2 Terminals) 

White  

Jumper Wire 

Removing jumper wire will allow system to be connected to N.C. 

contacts of a load shed system 

Heat Shed 

(2 Terminals) 

White 

Jumper Wire 

Removing jumper wire will allow system to be connected to N.C. 

contacts of a load shed system 

Room (2 Terminals) 

Any 

The remote room temperature sensor attaches here* 

Freeze (2 Terminals)  

White 

Freeze sensor attaches here 

Gen 

Any 

Allows system to connect to an automatic start generator system 

B- 

Blue 

Provides -12 VDC to upper unit control box 

Sig 1 

Purple 

Communication line between upper unit control box and thermostat 

Sig 2 

Black 

Communication line between upper unit control box and thermostat 

 

*  Zone 1 has option of using thermostat as room sensor 

 

Cool Only 

Boxes 

Plenum Terminal 

Designation 

Thermostat Wire 

Connection 

Function of Low Voltage Terminal 

Extending From Ceiling Plenum 

Heat Ready 

Boxes 

Yes 

BLUE 

Completes -12 VDC circuit for all relays 

Yes 

Yes 

YELLOW 

Energizes coil on Compressor Relay 

Yes 

Yes 

GH 

GREEN 

Energizes coil on High Fan Relay 

Yes 

Yes 

GL 

GRAY 

Energizes coil on Low Fan Relay 

Yes 

Yes 

FREEZE 

WHITE 

Evaporator Freeze Sensor Connections 

Yes 

Yes 

FREEZE 

 

 

No 

WHITE 

Energizes coil on Heat Relay 

Yes 

Содержание 8330-752

Страница 1: ...L BOX KIT 24 VAC COOL ONLY 9530A751 CONTROL BOX KIT 12 VDC HEAT PUMP 9430A751 ZONE CONTROL KIT 12 VDC COOL ONLY 9430A755 ZONE CONTROL KIT 12 VDC HEAT READY 9630A751 ZONE CONTROL KIT 12 VDC HEAT PUMP Airxcel Inc RV Products Division P O Box 4020 Wichita KS 67204 Coleman is a registered trademark of The Coleman Company Inc used under license Mach is a registered trademark 1976N350 9 14 PP ...

Страница 2: ...stallation CAREFULLY FOLLOW ALL INSTRUCTIONS AND WARNINGS IN THIS BOOKLET TO AVOID DAMAGE TO THE EQUIPMENT PERSONAL INJURY OR FIRE NOTE The words Shall or Must indicate a requirement which is essential to satisfactory and safe product performance The words Should or May indicate a recommendation which is not essential and not required but which may be useful or helpful 2 GENERAL INFORMATION AND RE...

Страница 3: ...nce the evaporator warms to 55 degrees F IMPORTANT The low temperature sensor is part of the ceiling plenum electrical circuit The probe must be inserted into the evaporator coil of the roof top unit by the installer when bolting the ceiling plenum to the roof top unit 3 PACKAGE CONTENTS The mounting kit package contains the following 1 Steel mount frame 2 Ceiling shroud assembly 3 Small parts pac...

Страница 4: ...te ease of installation allowances must be made for routing the low voltage wiring into the front of the opening Standard Control Box Zone Control Box Plenum Terminal Designation Thermostat Wire Connection Function of Low Voltage Terminal Extending From Ceiling Plenum R Red Provides 12 VDC to upper unit control box Cool Shed 2 Terminals White Jumper Wire Removing jumper wire will allow system to b...

Страница 5: ...strip marked FREEZE The heater assembly for the 47000 series is 47233 4551 The heater assembly for the 48000 and 49000 series is 9233 4551 Heat kits are purchased separately 3 9630A751 12 VDC Zone Controlled Heat Pump This kit consists of a control box assembly The evaporator freeze sensor is shipped in an envelope for installation by quick connects to terminal strip marked FREEZE Backup electric ...

Страница 6: ...r heat load shed optional B See Figure 5 for wiring requirements for multiple zones 3 Airxcel Inc low voltage wiring specifications A All low voltage wiring should be no smaller than 18 gauge B Low voltage wiring must be routed into the front side of the ceiling plenum opening C Low voltage wiring should not be routed with high voltage wiring D If low voltage and high voltage wires must cross they...

Страница 7: ...r the following steps See Figure 1 A Locate the upper unit mount gasket over the 14 to 15 square opening in the roof B Install the ceiling assembly mount frame using the four bolts found with the ceiling assembly C Proper tension has been achieved for each bolt when any portion of each gasket indicating tab has been pulled down even with the roof See Figure 1 The upper unit has now been properly i...

Страница 8: ...8530 750 5 Connect the roof unit 115 volt electrical conduit to the wirebox 9 pin receptacle and verify that the plugs are properly aligned and have snapped together securely 6 Locate the two machine screws inside the evaporator cover of the upper unit Align the control box over the screws and use the wing nuts supplied with the control box to secure it to the upper unit enclosure See Figure 2 for...

Страница 9: ...he strain relief found with the control box then through the 7 8 hole in the side of the box FIGURE 3 5 Wire nut the black field power conductor to the stripped black 12 gauge wire in the control box 6 Wire nut the white field power conductor to the stripped white 12 gauge wire in the control box 7 Wire nut the ground field power conductor to the stripped green ground wire in the control box 8 Ins...

Страница 10: ...10 FIGURE 5 ...

Страница 11: ...ly wiring to its power source Be sure all power remains off until beginning checkout procedure DANGER TO PREVENT THE POSSIBILITY OF SHOCK INJURY FROM APPLIANCE OPERATION THE WHITE WIRE MUST BE CONNECTED TO NEUTRAL IN THE SERVICE BOX ENTRANCE AND THE MECHANICAL GROUND MUST BE CONNECTED TO A GROUNDING LUG IN THE SERVICE BOX OR THE MOTOR GENERATOR COMPARTMENT 15 INSTALLING THE HEATER ASSEMBLY NOTE Th...

Страница 12: ...ns D Pull fabric duct material through ceiling assembly discharge opening Peel the release liner from the adhesive strip around the discharge opening Press the fabric duct material firmly in place around opening Cut off excess fabric on inside of ceiling assembly chute with a box knife taking care not to tear the fabric beyond the adhesive strip E Make sure the non allergenic filters are properly ...

Страница 13: ...13 FIGURE 9 FIGURE 10 Ş ...