background image

 
 
 
 
 

 

 

 

 

 

 

    RV Products Division 

 
 
 
 
 

INSTALLATION INSTRUCTIONS 

 

FOR 

 

9330F4552 FREE DELIVERY PLENUM KITS 

 

8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 

9330C755 CONTROL BOX KIT (12 VDC HEAT READY) 

8530-750 CONTROL BOX KIT (24 VAC COOL ONLY) 

9530A751 CONTROL BOX KIT (12 VDC HEAT PUMP) 

 
 

9430A751 ZONE CONTROL KIT (12 VDC COOL ONLY) 

9430A755 ZONE CONTROL KIT (12 VDC HEAT READY) 

9630A751 ZONE CONTROL KIT (12 VDC HEAT PUMP) 

 
 
 
 
 

Airxcel, Inc. 

RV Products Division 

P.O. Box 4020 

Wichita, KS   67204 

 

Coleman is a registered trademark of The Coleman Company, Inc. used under license.  Mach is a registered trademark. 

 

1976N350 (9-14) PP 

Содержание 8330-752

Страница 1: ...L BOX KIT 24 VAC COOL ONLY 9530A751 CONTROL BOX KIT 12 VDC HEAT PUMP 9430A751 ZONE CONTROL KIT 12 VDC COOL ONLY 9430A755 ZONE CONTROL KIT 12 VDC HEAT READY 9630A751 ZONE CONTROL KIT 12 VDC HEAT PUMP Airxcel Inc RV Products Division P O Box 4020 Wichita KS 67204 Coleman is a registered trademark of The Coleman Company Inc used under license Mach is a registered trademark 1976N350 9 14 PP ...

Страница 2: ...stallation CAREFULLY FOLLOW ALL INSTRUCTIONS AND WARNINGS IN THIS BOOKLET TO AVOID DAMAGE TO THE EQUIPMENT PERSONAL INJURY OR FIRE NOTE The words Shall or Must indicate a requirement which is essential to satisfactory and safe product performance The words Should or May indicate a recommendation which is not essential and not required but which may be useful or helpful 2 GENERAL INFORMATION AND RE...

Страница 3: ...nce the evaporator warms to 55 degrees F IMPORTANT The low temperature sensor is part of the ceiling plenum electrical circuit The probe must be inserted into the evaporator coil of the roof top unit by the installer when bolting the ceiling plenum to the roof top unit 3 PACKAGE CONTENTS The mounting kit package contains the following 1 Steel mount frame 2 Ceiling shroud assembly 3 Small parts pac...

Страница 4: ...te ease of installation allowances must be made for routing the low voltage wiring into the front of the opening Standard Control Box Zone Control Box Plenum Terminal Designation Thermostat Wire Connection Function of Low Voltage Terminal Extending From Ceiling Plenum R Red Provides 12 VDC to upper unit control box Cool Shed 2 Terminals White Jumper Wire Removing jumper wire will allow system to b...

Страница 5: ...strip marked FREEZE The heater assembly for the 47000 series is 47233 4551 The heater assembly for the 48000 and 49000 series is 9233 4551 Heat kits are purchased separately 3 9630A751 12 VDC Zone Controlled Heat Pump This kit consists of a control box assembly The evaporator freeze sensor is shipped in an envelope for installation by quick connects to terminal strip marked FREEZE Backup electric ...

Страница 6: ...r heat load shed optional B See Figure 5 for wiring requirements for multiple zones 3 Airxcel Inc low voltage wiring specifications A All low voltage wiring should be no smaller than 18 gauge B Low voltage wiring must be routed into the front side of the ceiling plenum opening C Low voltage wiring should not be routed with high voltage wiring D If low voltage and high voltage wires must cross they...

Страница 7: ...r the following steps See Figure 1 A Locate the upper unit mount gasket over the 14 to 15 square opening in the roof B Install the ceiling assembly mount frame using the four bolts found with the ceiling assembly C Proper tension has been achieved for each bolt when any portion of each gasket indicating tab has been pulled down even with the roof See Figure 1 The upper unit has now been properly i...

Страница 8: ...8530 750 5 Connect the roof unit 115 volt electrical conduit to the wirebox 9 pin receptacle and verify that the plugs are properly aligned and have snapped together securely 6 Locate the two machine screws inside the evaporator cover of the upper unit Align the control box over the screws and use the wing nuts supplied with the control box to secure it to the upper unit enclosure See Figure 2 for...

Страница 9: ...he strain relief found with the control box then through the 7 8 hole in the side of the box FIGURE 3 5 Wire nut the black field power conductor to the stripped black 12 gauge wire in the control box 6 Wire nut the white field power conductor to the stripped white 12 gauge wire in the control box 7 Wire nut the ground field power conductor to the stripped green ground wire in the control box 8 Ins...

Страница 10: ...10 FIGURE 5 ...

Страница 11: ...ly wiring to its power source Be sure all power remains off until beginning checkout procedure DANGER TO PREVENT THE POSSIBILITY OF SHOCK INJURY FROM APPLIANCE OPERATION THE WHITE WIRE MUST BE CONNECTED TO NEUTRAL IN THE SERVICE BOX ENTRANCE AND THE MECHANICAL GROUND MUST BE CONNECTED TO A GROUNDING LUG IN THE SERVICE BOX OR THE MOTOR GENERATOR COMPARTMENT 15 INSTALLING THE HEATER ASSEMBLY NOTE Th...

Страница 12: ...ns D Pull fabric duct material through ceiling assembly discharge opening Peel the release liner from the adhesive strip around the discharge opening Press the fabric duct material firmly in place around opening Cut off excess fabric on inside of ceiling assembly chute with a box knife taking care not to tear the fabric beyond the adhesive strip E Make sure the non allergenic filters are properly ...

Страница 13: ...13 FIGURE 9 FIGURE 10 Ş ...