![Coleman 7700 LP Gas Series Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/coleman/7700-lp-gas-series/7700-lp-gas-series_assembly-manual_2635958016.webp)
Ö
Ö
NOTE:
The Grill Lids should
be opened for Step 14 and 15.
Ö
Ö
Assemble Right Side Table to
the Grill.
Step
14
14-A
14-B
14-C
14-A
. Raise the Grill Lids.
Ö
Ö
Place the Right Side Table against the
Firebox and on top of the Right Rear
Panel.
Hardware shown actual size
(TN)
M6 x 15mm Screw
(4) Qty.
14-B
.
LOOSELY
install four Screws (TN)
upward through the Flange of the
Right Rear Panel into the Right Side
Table.
Ö
Ö
NOTE:
You will tighten these screws
LATER (during Step 15-C), after all
eight Screws (TN) are installed in
Step 14 and Step 15 (this helps with
alignment).
Right Side
Table
Right Rear
Panel
Flange
TN (x4)
Firebox
16