2. Connect a frame ground wire to the I/O module’s Frame Ground terminal. Connect the other end of the frame
ground wire to frame ground.
CAUTION
:
The shield ground connections of the RS232 OUT port, SENSOR port, and Frame Ground
terminal are internally connected. The system grounding is designed to be at a zero ground potential; this
zero ground potential extends through the cable and to peripheral equipment (e.g., a vision sensor, PLC,
etc.). To ensure safe operating conditions, it is strongly recommended that all ground connections are
checked to ensure that a zero ground potential is met.
3. Connect the I/O module's I/O wires.
a. Determine how I/O devices will be connected to the I/O module’s input and output terminals.
b. To loosen the appropriate screw terminals, use a screwdriver.
c. Connect the input and output wires to the input and output terminals.
d. Connect the other end of the input and output wires to the corresponding I/O device.
e. Tighten the screw terminals with the screwdriver to secure the wire leads in the terminal block; the
maximum torque is 0.4 Nm (3.5 in-lb).
4. To connect the vision sensor to a serial device, plug an RS-232 serial cable (DB9 male connector) into the I/O
module’s RS232 OUT port and connect the other end of the cable to the serial device. Tighten the connector
screws to secure it to the I/O module.
5. Connect the I/O Module cable (CCB-PWRIO-MOD-xx) to the vision sensor.
a. Connect the I/O Module cable’s M12 connector to the vision sensor’s Power, I/O and RS-232 connector.
b. Connect the I/O Module cable’s DB15 connector to the I/O module’s SENSOR port.
c. Restore power to the I/O module’s 24VDC power supply and turn it on if necessary.
41
Installation
Содержание In-Sight 1ABD
Страница 1: ...In Sight 2000 Series Vision Sensor Reference Guide 2019May06 Revision 5 7 3 29 ...
Страница 57: ......