![Coffee Queen TOWER Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/coffee-queen/tower/tower_user-manual_2634496020.webp)
20
.
7. Installation and start.
TOWER
7.1.
Place the brewer unit on a flat, level and waterproof surface.
7.2.
Connect the brewer unit to a
coldwater feed -1/2"R
with connection tube supplied.
NOTE!
The new hose set supplied with the appliance shall be used and that old hose
sets shall not be reused.
Connection to a closable valve is recommended.
Min. water pressure; 2bar (200kPa). Max. waterpressure; 8bar (800kPa).
Water supply to the machine is the customer’s responsibility according to
instruction and advice from the supplier.
In areas with high level lime problem, a descaling filter should be mounted.
6 adjustable feets.
7.3. Electrical connection;
The brewer is not reconnectable and may only be installed to the electric supply network
with a voltage that is stated on the brewer and shall be carried out by an Authorized
Electrician.
Recommended: Install a line circuit breaker and a earth fault breaker to the machine.
CAUTION!
Connection to a separate 3 phase only
- Brewer should be connected to 380 V with Zero and earth.
- Use 16 Amp fuses.
IMPORTANT!
Electrical installations must be done of an certificated electrician.
380 V 3 - phase + Zero + ground 9000W
Содержание TOWER
Страница 30: ...30 15 Måttskiss Dimension sketch Tower station ...
Страница 31: ...31 16 Måttskiss Dimension sketch Serving station ...