4. Installation Queen Pearl for integrated fitting
WATER LINE
8.
Installation must be carried out by a qualified fitter.
Installation of Queen Pearl for integrated fitting
6.
Connect the water hose from
carbonated water
on the cooling unit to
carbonated water
on the tap
pillar. Then connect the water hose from
cold water
on the cooling unit to
cold water
on the tap pillar.
7.
Mount the gas dome (
A
) on the carbon dioxide
cylinder (
B
) and then fit the supplied nipple on
the gas dome. Connect the carbon dioxide
cylinder to cooling unit inlet
CO2
using the hose (
C
).
8.
Fit the water filter (
D
) and connect the filter to the
water cooling unit inlet using the hose (
E
).
9.
Connect the supplied 1/2” hose to the water filter
and then to the water main. It is recommended that
you connect the hose to a shut-off tap.
Check that no kinks or sharp bends have formed
on the hoses during connection.
10.
Fit the drip tray and the tap bosses.
See page 9.
11.
IMPORTANT!
Fill with water
Before starting the cooling unit, it must be filled
with water. Lift the cooling unit cover and fill
the cooling tank with tap water until water runs out
from the drain valve.
12
.
Connect the plug to an
earthed 230V 10A
wall socket.
13.
Flush out approx. 2.5 litres of chilled still water
and then approx. 2.5 litres of carbonated water
before putting the machine into use.
Water IN
A
B
C
D
E
Drain
valve