
CQUBE SERIES
13
A
Now connect the electricity cable which comes from the base cabinet into the
electric socket at the machine (B).
Switch on the machine again and wait until the text in the display starts to
rotate.
The fresh-brew machine must be warm before any cold water
can be dispensed.
Note
Take a glass and press the button for cold water until water is dispensed in a
even fl ow and the pressure pump that is buzzing gives a different calmer sound
(cold water compressor is relatively quite so it should not usually be heard very
much)
Now press the button for carbonated water so the water can mix with the
carbon dioxide, keep the button pressed until you have a even fl ow of water.
When you release the button the pump will fi ll up the cooling unit and then turn
off. The machine is now ready for use.
INSTALLATION AND START-UP
B
Switch
Содержание CQube LF04
Страница 1: ...CQUBE SERIES MAINTENANCE MANUAL MM_EN Date 131203 ...
Страница 7: ...CQUBE SERIES 7 B C A Dimensions BARISTA GENERAL Model A B C BARISTA 818mm 235mm 456mm ...
Страница 50: ...CQUBE SERIES 50 Water system espresso FLOW CHARTS ...
Страница 52: ...CQUBE SERIES 52 Milk system FLOW CHARTS ...