Coffee Crafters – 708 S. Clearwater Loop Ste 105 Post Falls, ID 85854
Phone 509-228-6916 Websites
www.coffeecrafters.com
YouTube Page
Contact US: [email protected]
16
Step 3:
Place the Separating Funnel through the hole in the pot. You will need to line up the notch in
the funnel with the screw on the side of the pot in order to get it all the way down. Once the
funnel has cleared the screw, turn the funnel clockwise to lock it into place.
Screw
Notch