Страница 1: ...Classification Internal Maintaining or Shutting Down Your Post Mix System...

Страница 2: ...ipment Check turn on the C02 supply Ensure syrups boxes aren t empty are connected Allow system to stabilise for 5 minutes Ensure all nozzles and diffusers are in place Once per week Pour a total of 6...

Страница 3: ...uipment Clean nozzles diffusers drip trays in line with the cleaning guide Clean the valves refit nozzles diffusers Do not leave to soak in water Front End Tower or Head Turn off the water supply to t...

Страница 4: ...Classification Internal Restarting your Post Mix System 3 Valve Head 10 steps to get you up and running after shut down...

Страница 5: ...n the CO supply 3 Turn on the mains water supply 4 Reset the carbonator cooler 5 Cleaning Bag in Box connectors and checking best before dates 6 Replenish Carbonated water 7 Replenish in date Bag in B...

Страница 6: ...rotective Equipment Items you will need to complete the restart process Check and turn on the CO supply Turn on the mains water supply Turn on the CO Check gauge goes to approx 600psi Turn on isolator...

Страница 7: ...k on Clean Bag in Box Connectors Check that the Bag in Box is in date remove any that are out of date Clean connectors in clean warm water Re connect in date Bag in Boxes 6 Replenish carbonated water...

Страница 8: ...ints You will need 10 ltrs of clean water in a bucket A pair of scissors An old Bag in Box Small container jug of warm water To get water into the system first cut the connector neck out of the old Ba...

Страница 9: ...syrups Now connect a fresh syrup Bag in Box to the line Go to the dispense point farthest from the cooler and pour product until it flows clear Make a note of how much volume was dispensed and use th...

Страница 10: ...d carbonation Wipe over the covers and display with a damp cloth making sure that power is switched off Refit the drip tray and cup rest Note Allow systems to stabilise and cool for at least 4 hours b...

Страница 11: ...Classification Internal...

Страница 12: ...Classification Internal Restarting your Post Mix System Hand Bar Valve 10 steps to get you up and running after shut down...

Страница 13: ...n the CO supply 3 Turn on the mains water supply 4 Reset the carbonator cooler 5 Cleaning Bag in Box connectors and checking best before dates 6 Replenish Carbonated water 7 Replenish in date Bag in B...

Страница 14: ...rotective Equipment Items you will need to complete the restart process Check and turn on the CO supply Turn on the mains water supply Turn on the CO Check gauge goes to approx 600psi Locate the mains...

Страница 15: ...k on Clean Bag in Box Connectors Check that the Bag in Box is in date remove any that are out of date Clean connectors in clean warm water Re connect in date Bag in Boxes 6 Replenish carbonated water...

Страница 16: ...ints You will need 10 ltrs of clean water in a bucket A pair of scissors An old Bag in Box Small container jug of warm water To get water into the system first cut the connector neck out of the old Ba...

Страница 17: ...fresh syrup Bag in Box to the line Go to the dispense point farthest from the cooler and pour product until it flows clear Make a note of how much volume was dispensed and use this as a guide when flu...

Страница 18: ...nk and discard it Pour a second drink and test for a temperature of 5 C Pour a third drink and check for taste and carbonation Wipe over the bar clamp mount the display font and the hose with the clea...