Home And Office Set-Up
Base Station
Operation
(From 120V AC
House Current)
Base Station Operation
(From 120V AC House Current)
To operate your transceiver from home or office
you will need a 13.8 volt DC Power Pack rated at a
minimum of 2 amps, and a properly installed
base station antenna.
Home And Office Set-Up
Warning!
Do not attempt to operate this
transceiver by connecting it
directly to 120 vac.
1
Connect properly installed and matched base
station antenna.
Simply connect the red (+) and black (-)
leads of the transceiver to the corresponding
terminals of the power pack.
Plug power cable into back of unit marked
“Power”. Be sure to observe polarity markings.
2
3