Chapter 5: Installation check and test
Test the SAILOR 6130 LRIT System
75
5555
Install
ation che
ck
and
5.2 Test the SAILOR 6130 LRIT System
If you have a SAILOR 6130 LRIT System, you may not have anything
connected to your SAILOR 3027, except for a power supply.
However, we recommend testing the signal path. This can be done by
requesting a LESO (LES Operator) in the Inmarsat-C system to perform a
PVT (Performance Verification Test) on your SAILOR 3027 LRIT Terminal.
The LESO returns the result of the test, which is either that the mobile
passed or failed the test. A written result may look like this:
Any further requirements for testing are defined by the Flag administration.
Is the shield of the CAN cable connected
correctly to the ship ground (hull)?
Is the polarity of power connections
correct? Red wire = DC+, Black wire = DC-
Check item
Reference
OK
Table 12: Installation check list (Continued)
Test
Id
Group
Start time
End time
Overall
result
pvt
test
ss
m
subsys
tem
20110128
15:07:45
20110128
15:17:07
finished
pvt
Содержание SAILOR 6120
Страница 1: ...SAILOR 6120 30 40 50 Installation manual...
Страница 2: ......
Страница 3: ...i SAILOR 6120 30 40 50 Installation manual Document number 98 154541 A Release date November 15 2017...
Страница 12: ...List of tables x...
Страница 31: ...Chapter 2 Install the system Install the SAILOR 3027 19 2222 Install the system Vertical pole Horizontal pole...
Страница 96: ...Chapter 5 Installation check and test 84 Test the system with SAILOR 6018...
Страница 116: ...98 154541 A www cobham com satcom...