5.1 Power-up procedure
1. Connect power to the ACU.
2. Switch on the ACU. The unit starts up and goes through an initialization procedure:
• ACU POST
• ADU Initializing
• ADU POST
• READY
This may take some time (up to a couple of minutes).
3. The SAILOR 600 VSAT Ka is ready to be calibrated (for first time power up) or receive
data from the modem (when in normal operation).
The LEDs
Power
and
Fail/Pass
are
steady green
, the LED
Logon
is off. For further
information on status indicators see
Status signalling with LEDs and status messages
on page 8-13.
Make sure there are no hardware failures or error codes shown in the display of the
ACU. For more information on error codes and events see
4. Make an azimuth calibration, see
Heading input and position system
Create one or more VSAT modem profiles. See
5. Create one or more satellite profiles. See
6. For more detailed step-by-step instructions, see the chapter
Содержание SAILOR 60 GX
Страница 1: ...Cobham Public SAILOR 600 VSAT Ka SAILOR 600 VSAT Ka High Power Installation manual...
Страница 116: ...Software update 8 12 Chapter 8 Service 98 148248 C Figure 8 11 Verifying software update...
Страница 181: ...Telenor antenna approval G 4 Appendix G Approvals 98 148248 C...
Страница 192: ...98 148248 C www cobham com satcom Cobham Public...