Co-op ICE FISHING hut Скачать руководство пользователя страница 9

ICE FISHING HUT ASSEMBLY 

(continued)

8.1

    Position the Header (18) on top of the Trimmer Studs (17) as shown and    

 

secure with 3" Deck Screws.

8.2

    Position the Front Wall Bottom Plate (19) and Front Wall Top Plate (20)  

 

on the ends of the studs as shown.

8.3 

Confirm the stud locations and secure the plates to the studs with  

 

3" Deck Screws.

8.4

    Position the Bench Legs (6) as shown and secure with 3" Deck Screws.

7.1

    Position the Window Blocking (15) and Front Wall Studs (16) as shown  

  

and connect with 3" Deck Screws.

7.2

    Connect the Trimmer Studs (17) to the Front Wall Side Sections with  

  

2½" Deck Screws.

STEP 7. 

FRAME THE FRONT WALL SIDE SECTIONS

STEP 8.

 FRAME THE FRONT WALL

9

39¾"

25½"

19"

31

½

"

2½" Deck Screws - 12

3" Deck Screws - 8

3" Deck Screws - 12

19 

7

/

8

"

19 

7

/

8

"

Содержание ICE FISHING hut

Страница 1: ...oated Deck Screws 11 2 long 396 screws 2 5 lbs 21 2 long 24 screws 0 2 lbs 3 long 158 screws 1 75 lbs Hurricane Ties 6 ties 11 2 Rigid Insulation 2 x 8 1 sheet 4 Tee Hinges 3 hinges Spruce 2x2 8 ft 27...

Страница 2: ...ront Wall Bottom Plate 1 3 Rim Joist 2 20 Front Wall Top Plate 1 4 Skid 3 21 Front Wall Sheathing no window 1 5 Floor Sheathing 1 22 Front Wall Sheathing window 4 6 Bench Leg 4 23 Rear Wall Sheathing...

Страница 3: ...even 27 boards 8 long are required for the following components 6 7 8 9 10 11 12 13 14 15 16 17 19 20 28 31 and 32 CUTTING DIAGRAMS continued 71 71 71 71 44 26 44 15 15 15 15 78 44 84 10 72 14 79 781...

Страница 4: ...OR SHEATHING 1 71 i l I 88 8 FRONT WALL SHEATHING no window WINDOW RETAINER Optional REAR WALL SHEATHING r16 11 __ 2 I 71 I 23 3 8 PLYWOOD Eight 8 4 x 8 sheets are required for the following component...

Страница 5: ...5 CUTTING DIAGRAMS continued 75 75 16 16 16 29 885 8 885 8 83 53 44 44 48 48 44 253 8 22 41 8 301 4...

Страница 6: ...rews NOTE This Ice Fishing Hut is compact enough to fit in a 4 x 61 2 truck box with the tailgate closed It can be constructed with or without windows and insulation can be added to the walls floor an...

Страница 7: ...es and connect the Floor Sheathing 5 to the floor frame using 11 2 Deck Screws STEP 3 CONNECT THE SKIDS STEP 4 SHEATH THE FIOOR 7 Hurricane Ties 6 1 Wood Screws 60 Hurricane Tie 1 Deck Screws 42 NOTE...

Страница 8: ...ion of the Bench Leg Assemblies 6 1 After confirming the stud locations connect the Side Wall Studs 11 to the Side Wall Bottom Plate 12 and Side WallTop Plate 13 with 3 Deck Screws 6 2 Connect the Ben...

Страница 9: ...tions and secure the plates to the studs with 3 Deck Screws 8 4 Position the Bench Legs 6 as shown and secure with 3 Deck Screws 7 1 Position the Window Blocking 15 and Front Wall Studs 16 as shown an...

Страница 10: ...priate sheathing The Front Wall sheathing should sit 1 8 below the top plate and 1 8 back of the studs The sheathing should overhang the bottom plate by 13 8 DO NOT install sheathing above the door at...

Страница 11: ...verhangs into the floor joists and studs Secure the Side Wall Sheathing 24 to the side wall framing with 11 2 Deck Screws STEP 11 SHEATH THE SIDE WALLS STEP 12 STAND THE WALLS 11 1 Deck Screws 72 1 De...

Страница 12: ...h 11 2 Deck Screws 14 2 Install the Header Sheathing 27 above the door with 11 2 Deck Screws 13 1 Set the Rafters 25 between the Rear Wall Studs and the FrontTop Plate and Header 13 2 Secure the rafte...

Страница 13: ...t assembly to the Bench Rail with 3 Deck Screws 15 1 Connect the Bench Seat Filler 28 to the Bench Sheathing 29 with 11 2 Deck Screws 15 2 Fill the space between the sheathing with Rigid Foam Insulati...

Страница 14: ...responsible for any applicable code approval or permits associated with the construction and use of this plan Check with a building code official or a building expert to make sure that the materials a...

Отзывы: