User’s Manual
Page 1
STEP BY STEP FOR SETTING UP A C76 FOR
UCCNC
MARCH, 2021
The main objectives of this step-by-step instructions are:
-
Power the Board and e-stop and test that the board activates/deactivates at hardware level only
with e-stop.
-
Install the UCCNC license and configure the pinout and functions of UCCNC supported by
the C76 and test that UCCNC is communicating with the C76 OK.
-
Enable and configure the Safety Charge Pump to make sure the C76 activates (green LED)
when UCCNC becomes active (out of reset).
1.
Make sure the controller is connected to an Ethernet port on the PC and powered with LEDs
ON.