4.1.1 Motor Assembly
4.1.1.1
Remove tape on motor shaft.
Loosen motor pulley set screws.
Install motor pulley on motor shaft as indicated.
NEMA 23 Stepper Motor
Motor Pulley
Assembly Note
Ensure keyway is fully seated in slot on motor shaft to allow easy installation of the motor pulley.
CRP4896
Assembly Instructions
Version 2018Q3.3
© 2018 CNC Router Parts LLC
All Rights Reserved
Содержание CRP4896
Страница 1: ...CNC Router Parts CNC Router Parts CRP4896 4 x 8 Standard CNC Machine Kit Assembly Instructions...
Страница 81: ...2 2 Gantry Risers CRP4896 Assembly Instructions Version 2018Q3 3 2018 CNC Router Parts LLC All Rights Reserved...
Страница 119: ...3 3 Gantry Bumpers CRP4896 Assembly Instructions Version 2018Q3 3 2018 CNC Router Parts LLC All Rights Reserved...
Страница 125: ...3 4 Linear Carriages CRP4896 Assembly Instructions Version 2018Q3 3 2018 CNC Router Parts LLC All Rights Reserved...
Страница 174: ...5 1 Z Axis Installation CRP4896 Assembly Instructions Version 2018Q3 3 2018 CNC Router Parts LLC All Rights Reserved...
Страница 196: ...6 2 Gantry Cable Track CRP4896 Assembly Instructions Version 2018Q3 3 2018 CNC Router Parts LLC All Rights Reserved...