background image

Horizontal 3” Boiler Instructions v1.2 

Copyright - Chiltern Model Steam Engines 

 

Page 3. 

Gradually tighten each screw ensuring the supports are not twisted and sits flat on a mounting board 
(customer supplied). 

Place the insulation sheet, which protects the mounting board from the heat of the burner, loosely 
within the supports and screw the boiler securely to the mounting board using the lugs on the 
support sides. 

The boiler cylinder is normally supplied with the Outlet and Safety Valves already fitted. These can 
be removed by unscrewing the long cylinder M5 socket head screws. This will allow splitting the 
cylinder body into two halves and the centre joining section. Remove the valve nuts which are on 
the inside of the cylinder and then unscrew the respective valves from the cylinder body from the 
outside. 

Assembly is a reverse of the above but ensure that the two O ring seals lubricated and are in their 
proper place. 

Painting 

It is recommended that the base sides and ends are coated with heat proof/high temperature 
aerosol paint such as that used on barbeques or car brake callipers. The boiler cylinder can be left or 
sprayed black to match. 

Boiler Mounting

 

The boiler should be secured to a base mounting board using the 4 lungs on the sides. Allow plenty 
of space around the boiler’s base to ensure a free flow of air to the burner. 

Gas Burner 

The BIX ceramic gas burner when lit gets very hot so always use protective gloves when handling 
and allow to cool before making any adjustments.

 

Take care not to damage the ceramic burner 

element or gas jet. 

The boiler kit is supplied with a brass gas jet carrier which sits in the brass burner mixer tube and is 
secured with a locking screw, as shown in the photo. 

 

Burner Mixer 
Tube

 

Gas Jet

 

Gas Jet Carrier

 

Gas Jet Carrier 
Connection Nut 

Locking 
Screw 

Содержание Horizontal 3

Страница 1: ...ckness 3 5mm Safety Valve Release 20psi Steam outlet valve 1 4 x 40tpi ME Brass Fill Plug 1 4 x 40tpi ME BIX Ceramic gas burner 118 L X 14 W X 20 H Burner jet connection 1 4 x 40tpi ME Gas Jet Size No...

Страница 2: ...oiler driving our Beam engine https www youtube com watch v ZET 58BWwA and Mill Single engine https www youtube com watch v XBPHYm4m3XQ The boiler has a simple cylinder design made of 3 5mm thick alum...

Страница 3: ...outside Assembly is a reverse of the above but ensure that the two O ring seals lubricated and are in their proper place Painting It is recommended that the base sides and ends are coated with heat pr...

Страница 4: ...jet carrier should sit just outside the open end support to ensure a free flow of air see attached photo No forced draft is required and indeed could have a detrimental effect on the burner boiler Se...

Страница 5: ...the boiler cylinder when fine tuning may be necessary The lock screw can then be securely tightened make a note of the position of the jet carrier in case it needs to be removed Lighting the Burner WA...

Страница 6: ...peed up steam raising Conversely when the boiler is up to pressure reduce the gas flow Safety Pressure Valve The boiler is fitted with a safety valve to prevent the steam pressure rising above the max...

Страница 7: ...alised or de ionised water as this is not the same as distilled water and could cause long term damage Remove the boiler filling plug and fill the boiler with clean water There has to be a space above...

Страница 8: ...the gas burner once the boiler is up to steam The supply pipe from the canister tank must be connected securely to the burner s gas jet carrier use PTFE tape to get a good seal on the threads Check th...

Страница 9: ...imum working pressure 3 Steam pressure test to check the correct functioning of the safety valve Troubleshooting The tiny gas jet hole can become blocked by small particles of dirt or if left unused m...

Отзывы: