ENGLISH
19
TECHNICAL MANUAL
Grinder-doser of the dispensing unit 1 and 2
Pump functionality
Solenoid valve of the dispensing unit 1 and 2
Solenoid valve for filling the boiler with water
Steam solenoid valve
(if it exists)
Heating element relay of the dispensing unit 1 and 2
(after removing the front base panel and the electronics protection, verify on
the electronic board if the LED is off, cfr. paragrap 11.6 of the wiring diagrams)
Water relay
Repeat the same steps for the following auxiliary
systems if they are enabled
Cappuccino-maker steam suction solenoid valve
Alarm buzzer
(if it exists)
Cappuccino-maker air solenoid valve
Cappuccino-maker breather solenoid valve
DIAGNOSTICS
GRINDER GR 1 - 2
DIAGNOSTICS
pUMP
DIAGNOSTICS
rEL gr 1 - 2
DIAGNOSTICS
REL BLR
DIAGNOSTICS
rEL STEAM
DIAGNOSTICS
tEMP gr 1 - 2
DIAGNOSTICS
rEL h2o
DIAGNOSTICS
AUX REL 1 - 2
DIAGNOSTICS
AUX3 REL
DIAGNOSTICS
ev 1
DIAGNOSTICS
REL.ADD H2O GR 1 - 2
DIAGNOSTICS
ev 2
DIAGNOSTICS
ev 3
DIAGNOSTICS
buzZER
PLEASE SELECT!
t=XXX YY:YY:YY
Using the ENTER and ARROW keys carry out
the functionality tests on the following components:
To exit programming, press MODE a few times until the
script
PLEASE SELECT!
in seen
All manuals and user guides at all-guides.com
Содержание AK
Страница 1: ... 8720 7 2 0 5 QJOLVK 7 1 0 18 5 All manuals and user guides at all guides com a l l g u i d e s c o m ...
Страница 2: ...All manuals and user guides at all guides com ...
Страница 48: ...All manuals and user guides at all guides com ...
Страница 49: ...All manuals and user guides at all guides com ...