26
Shifter Cable
TRANSAXLE (ED65): GASOLINE VEHICLES
6.
Cut wire ties securing shifter cable to chassis.
7.
Make note of cable routing, then remove shifter cable from vehicle.
2
3
1
4
4
2
3
5
1
3064
Figure 26-13
Shifter Cable at FNR Handle
3065
Figure 26-14
Shifter Cable at Transaxle
SHIFTER CABLE INSTALLATION
1.
Install shifter cable (2), routing it exactly as it was originally, from instrument panel to transaxle.
2.
Place rear of cable (2) in FNR/accelerator cable bracket with a jam nut (1) on each side of bracket
. Tighten jam nuts (1) to 22 ft·lb (29.8 N·m).
3.
Hook shifter cable end (4) into transaxle shift lever (5) and secure with bowtie clip (3).
4.
Feed front of cable (2) through its mounting hole and push the plastic anchor into hole until tangs (4) snap
into place
.
5.
Snap cable end socket (1) onto stud (3) of Forward/Reverse shifter handle.
6.
Secure shifter cable along chassis with wire ties.
7.
Connect battery and spark plug wire(s).
See Connecting the Battery-Gasoline Vehicles on page 1-5.
SHIFTER CABLE ADJUSTMENT
Cable is properly adjusted when both the Forward/Reverse handle at instrument panel and shift lever on transaxle are
in the NEUTRAL position at the same time.
To adjust, the jam nuts (6) at the FNR/accelerator cable bracket must be loosened and moved forward or backward as
required
. Tighten jam nuts (6) to 22 ft·lb (29.8 N·m).
Page 26-14
2017 Carryall 500 and 700 Maintenance and Service Manual
Содержание Carryall 500
Страница 2: ......
Страница 16: ......
Страница 120: ...8 Tires WHEELS AND TIRES Figure 8 2 Inflate Tire Page 8 4 2017 Carryall 500 and 700 Maintenance and Service Manual ...
Страница 452: ...NOTES ...
Страница 453: ...NOTES ...
Страница 454: ...NOTES ...
Страница 455: ......
Страница 456: ......