20
Unitized Transaxle Installation
UNITIZED TRANSAXLE: DASH-MOUNTED
SHIFTER
1
2
1. Nuts. 2. Pull spring release back to connect shifter cable to lever.
566
Figure 20-46
Shifter Cable (Top View)
565
Figure 20-47
Engine Ground and Retaining Nut
25. Connect accelerator cable to actuator cam in the electrical box. Position the accelerator cable in the mounting
slot in the wall of the electrical box and tighten mounting nuts to 18 in-lb (2.0 N·m)
.
Install electrical box cover and tighten mounting screw.
26. Remove the 1/4-inch bolt from the fuel line and connect the fuel line to the carburetor and secure with a hose
clamp
564
Figure 20-48
Connect Cable to Cam and Secure with
Retaining Nuts
846
Figure 20-49
Connect Fuel Line
27. Connect the impulse line to the fuel pump and secure it with the hose clamp
.
28. Connect air intake hose to carburetor and secure hose clamp
Page 20-18
2007-2009 Turf 252, Carryall 252 and XRT 900 Maintenance and Service Manual
Содержание CARRYALL 252 2007
Страница 2: ......
Страница 4: ......
Страница 42: ......
Страница 100: ......
Страница 112: ......
Страница 202: ......
Страница 290: ......
Страница 330: ......
Страница 458: ......
Страница 476: ......
Страница 490: ......
Страница 506: ......
Страница 518: ......
Страница 524: ......
Страница 533: ......
Страница 535: ......
Страница 536: ......