4.4 The electrical installation Must be carried out by a qualified
electrician Following strict standards.
4.5 Be sure that the earth cable connection is correctly made.
4.6 Wires serving as equipotential bonding conductors shall have a
cross section area between 2.5mm and 6mm.
4.7 After the unit has been wired up turn on the power and press
the reset button of the GFCI, (Ground Fault Circuit Interrupter)
the GFCI works and cut the power, Then repress the reset button
on the GFCI to reconnect the power. If the above operations do
not work check the GFCI connections, turn off the power supply
until the problem is solved and “RESET” Appears.
CAUTION
: In order to avoid a hazard due to inadvertent resetting of
the thermal cut out, this Pond heater must NOT be powered
through an external switching device, such as a timer, Or connected
to a power supply circuit that is regularly switched
ON and OFF.
-4-
-5-
Edition: 2017-09 a
9.
Technical Data
10.
Heater Dimension
Fig.1
2000
2000
9080
Power
(Wattage)
1000 1000 4540
Model
Pond water
Volume
Gallon Litre
A
Model
Fig. 2
Fig. 3
130
210
30
30
Solvent Glue
32 or
33.5
48.5 or
50
1
5
6
207
202
130
120
94
1
4
8
.5
A
5.
Controls and Operations
5.1 Due to the safety flow switch that is installed on this unit, the
heating elements will not operate unless the correct amount of
flow is being pumped passed the flow switch. (A minimum of
4000Lph of water is needed to trigger this switch).
5.2 Reset Button is depressed inside the thermostat during normal
operation (
Fig4
)
Should for any reason the reset button pop out and cut the
power supply. The thermostat will have to be manually reset,
After firstly trouble shooting any faults if in any doubt always
consult with a qualified person.
The minimum continual operating flow rate 4000Lph is needed to
operate heater.
6.
Controls Prior To Initial Start-Up
6.1 Check the direction of flow of water is set to same direction as is
indicated by a directional arrow on the side of heater unit.
6.2 Check that the mains voltage and frequency are in Accordance
with what’s on the model ID Plate. (
Fig.5
)
6.3 After you have finished installing your Heater it will be
necessary to check there are no leaks at any of the joins or
connections do this by turning on your system pump and allow
the pump to run for 30-60 minutes without turning on the heater
at this point to ensure that there are no leaks this will also allow all
trapped air to be expelled from the heater this will to avoid any
unwanted hot spots inside the heat exchange chamber.
7.
Start Up
Turn the pump and heater on
Only!
when inlet and outlet pipes
are connected to the corresponding feed and return pipes.
8.
Maintenance, Cleaning and Storage
8.1 The Cloverleaf Pond Heater does not require any special
maintenance or programming, If the heater is to be left idle for a
period of time. We would be recommend to disconnected and
Clean and dry the heater before storage,Store in a dry well
ventilated place.
8.2 If any reason the mains power lead gets damaged it must be
replaced by a qualified electrician.
CL-PH1kW
CL-PH2kW
CL-PH1kW
CL-PH2kW
Pond Heater
Operating Instructions
IMPORTANT : Notice Please Read
Before Installing and Turning on !
Fig. 5
Models
CL-PH1kW
CL-PH2kW
Fig. 6
Min - Water Level
TM
Cloverleaf
Simply the Best
30
30
www.cloverleaf.uk.net