background image

Getting Started

General Tips

© 2018 ClosetMaid LLC | Ocala, FL 34471 | 1-800-874-0008 | www.closetmaid.com | www.closetmaid.ca

•  Please refer to the instruction sheet provided in the product package for the specifics on required 

& recommended tools for the assembly of the products.  

• 

Take an inventory of the parts for the products purchased to insure you have everything you need 

for the installation.  

• 

Pre-plan the placement of the towers.

Parts List

1 - 25 In. Starter Kit

 

• 

Assemble and build your towers.  

•  Place your towers, making sure to affix them to the wall as directed.

                              

• 

Measure the length that the rods will need to be for each side.  Make sure the span between units 

or unit and wall is not greater than 48 in.  The top shelves and closet rods fit a maximum space of 

48 in.

•  The expandable closet rods are 30 in. to 48 in. long.  If the length is shorter than 30 in. the rod will 

need to be cut. 

• 

Install the closet rods and top shelves.

• 

Assemble and install any drawers into the tower unit (sold separately).  

3 - 48 In. Top Shelf

2 - 25 in. x 10 in. D 

Modern Drawer

2 - 25 in. x 5 in. D 

Modern Drawer

3 - Top Shelf Support Kit

1 - 25 In. Modern Door Pair

Отзывы: