INSTRUCTIONS
A .Before installation(do not get through the power)
1.
Place the machine on level ground, keep it 15cm away
from the wall to let air through.
2.
Do not place high-pressure articles, combustibles and
conducting materials etc. near the machine.
3.
Do not keep it sun-scorched and rain-drenched to avoid
dangers.
4.
Please use running water recourse, do not use other
water recourses insufficient, need to add a blower pump, if
the hydraulic pressure too high, need to add a pressure
reduction valve. We suggest the water pressure is adjusted
to 0. 2MPa-0. 25MPa.
B. Disposing pipes
1.
The method for disposing pipes in this booklet( See parts
notes ) only give some instructions to ordinary
circumstances, under special circumstances, please design
another in accordance with the work field (Ask our
company or agents to design and install).
2.
Shall install a water inlet valve on the intake channel, for
the convenience of maintenance in the future.
3.
Please adopt the standardized fittings provide by the
machine, if adopt other fittings, the resistance to pressure of
the fittings shall be 1 Mpa, to avoid a leaking in the future.
4.
Take down the front panel( lift up the front panel and pull
it outward),tear off the shells of two filter elements, install
two filter elements provided the machine( at the position of
the inlet, it is colating, the position of outlet, it is finely
filtering ) please screw it with a special wrench.
5.
Separately install two stainless steel hook-type taps two
outlets on the basin.
6.
Please connect the drinker and the running water pipe
with 3/8 joint and a highpressure soft tube; the drain pipe
connects the outlet of the machine.
C Power distributions (please do not get through the power
first)
1.
Please distribute the power according to the voltage
indicated on the data plate of the machine.
2.
Must use three-core sockets with ground wires( the
ground wire shall be connected well.
3.
After finished distribution, do not get through the power
to avoid overheating and damaging the machine.
D Steps of installation
1.
All the allocations and distributions shall be finished in
accordance with the above instructions.
2.
Open the water inlet valve, lift up the press-handles of the
red and blue taps. Lay down the press-handles until two
taps drain water for a while.
3.
Open the cooling switch.
4.
Install the front panel.
After finished the installation, please check whether there
are leakages from the machine, if there are leakages, please
cut off power immediately and close the water recourse and
repair it.
FEATURES
This machine can get rid of dregs, peculiar smell, colon
bacillus, slight chemical medicines etc.
This machine possesses big capacity, stainless steel shell,
safe and sanitary stainless steel inner bladder, low noise etc
This machine is a kind of drinker combining purification,
supply for continual cold and warm water and is an ideal
drinker suitable for schools hospitals, organs and factories
and various public places etc.
Function
Voltage
Frequency
Cooling Power
Cooling
Capacity
Cold Water
50-60 Hz
220V - 240 V
120 W
25 L/h
(7-12 ºC)
TECHNICAL DATA
PROBLEM
REASON
MÉTODO DE FIJACIÓN
Not cooling
Not cooling
Water leakage
Water too small
No water drain
out of the tap
Drainage not smooth
The cooling switch
keeps closed
The socket is
cut off
The water pipe
damaged
The filter elements
is dirty
Water inlet valve
closed or water break
Dregs has been blocked
up the drain pipe
Open the switch
Change the socket
or check the power
Closed the power
and inform repairs
Change the filter elements
Open the intake valve
or check the water
resource
Remove the obstruction
with the iron wires
MAINTENANCE
*If there are any other breakdowns, please contact with our company or agents.
ANNEX LIST
NAME
6M water pipe
Filter
Drain pipe
Joint
Wrench
Inlet tube
Operation
Instruction
QUANTITY
1 PC
1 PC
2 Sets
1 PC
1 PC
1 PC
1 Set / 2 PCS